- Loma linda university medical center General Aptitude Interview Questions
- Loma linda university medical center Trainee Interview Questions
- Loma linda university medical center Personal Questions round Interview Questions
- Loma linda university medical center HR Interview Questions
- Loma linda university medical center Lead Interview Questions
If Vijay gives ‘x’ marbles to Ajay then Vijay and Ajay would have V – x and A + x marbles.
V – x = A + x — (1)
If Ajay gives 2x marbles to Vijay then Ajay and Vijay would have A – 2x and V + 2x marbles.
V + 2x – (A – 2x) = 30 => V – A + 4x = 30 — (2)
From (1) we have V – A = 2x
Substituting V – A = 2x in (2)
6x = 30 => x = 5.
1/4, 1/8
4*8=32
32-4=28
28-8=20
28*20/(4^2)=35.00
cant say
If c is 5 times faster than a then he can do it in 2 days alone.
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
13km
The probability that a child will be born male on any given day is always 1/2.
Suppose:
In any time period, the family making out babies and half boys and another half girls then, In the next time period: half the families turn themselves off and again the half remaining families making out the babies which repeat the first period.