Ans = 8
Use simple box method
[1][2][2][2]= 1x2x2x2 =8
Logic >
once place have 2 number (2,6)
Tens place have also 2 number (7,3)
So that number is divisible by 4
Now, 2 numbers fixed at once and tens place left 2 numbers which is choice at hundredth place
Now 3 number fix left 1 number which is placed at thousands place
Total number form is 4×4 = 16
But divisible by 4 is 1x2x2x2 =8
Tuesday
ans: A/2
u get a diamond shape when u join those mid points
consider the 4 unshaded triangles
and u can form 2 square
when u analyse the squares u will get the answer
B.25
₹1 today increases to (1+1/8) = 9/8 after 1year.
After 2 years it increases to 9/8 of 9/8 = (9/8)^2 =81/64 times.
Hence ₹64000 increase to 64000×81/64 =₹81000
1km = 1000m
Xkm = 300m
X=0.30km
1hr = 3,600s
X = 40.5s
0.01125hr
Therefore; 0.3km/0.1125hr= 26.6666=26.67km/hr
225
R
T,P,R,Q,S
5%
option c is the answer
as
1/2 for household
1/4 for rent
1/5 for travel
remaining for deposit in bank(i.e) 1/2+1/4+1/5=19/20 ; 1-19/20=1/20
so 1/20 for deposit
1/20(x)=50
hence x=1000
option c is the answer
Answer:
24
Step-by-step explanation:
A + B = 40.
And at Rs 7 a kg for 40 kg, you want a total of Rs.280.
So the second equation is 9A + 4B = 280
From the first equation: B = 40 – A
and sub into the second equation:
9A + 4(40-A) = 280
9A + 160 – 4A = 280
5A = 120
A = 24.
And you should check: B should equal 40-24 = 16. Check with the final equation: 9*24 + 4*16 = 216 + 64 = 280. So it works.
Your answer, of course, is A = 24
C.1175
B. 70%
these are question tht are seem to be like it consumes
time. so dont see jus the question and run to the next .
ans. a) 12
if 9 balls are added then the ratio to the combination
becomes 2:4:3.
9 balls make the ratio 3 for grey balls in tht mixture.
so the factor is 9/3 = 3 (in tht mixture)
so the same factor has to be maintained through out the
ratio. so black balls is 4 * 3 = 12 and white balls is 2 *
3 = 6.
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
36