It is About 35 Billion
Since the total train length passed the tunnel so the distance would be the length of train added to the tunnel legth
D=150+300=450 mt.
speed = distance/time
speed = 450/(40.5/3600)
speed =40,000 mt/sec
sister
X filling rate is 1/18 or 4/72 per hour
Y filling rate is 1/24 or 3/72 per hour
Combined as a pair it’s 7/72 in a complete 2 hour alternating sequence
72+ 7/72 =10 sequences = 70/72 on 20 hours, The outstanding balance is just 2/72
So at 20.5 hours with X turn filling is 100% complete with 72/72
Answer: It will take 20.5 hours to completely fill this tank.
Analysis of measured filling process, from X = 42/72 share & from Y = 30/72 share
1200 meter
I’m interested in this job because I can see that, in this role, my skills could help solve this problem within your company. I also see an opportunity for me to learn and grow these skills, so we both would benefit personally, professionally, and financially.
Speed of train = 54km/hr
= 54 x (5/18) m/s
= 15 m/s
Length of train = 165m
Time required to cross a bridge of 660m in length = (660+165) / 15
= 55 seconds
3, 8, 15, 24, 34, 48, 63
8-3 = 5
15-8 = 7
24-15 = 9
34-24 = 10 this one should be 35-24 = 11
48 – 34 = 14 based on the correction will be 48-35 = 13
63-48 = 15
the difference will create a series 5,7,9,11,13,15…..etc
21 days
Greatest number of 5 digits=99, 999
Smallest number of 5 digits=10, 000
And their sum=99, 999+10, 000=109, 999
Urinary Tract Infection
Let the numbers be x and x + 2.
Then, (x + 2)2 – x2 = 84
⇒ 4x + 4 = 84
⇒ 4x = 80
⇒ x = 20.
∴ The required sum
= x + (x + 2)
= 2x + 2
= 42