27
Sum of all numbers in series= 870 (I.e 312+162+132+142+122)
Average=sum of numbers/count of numbers
Average= 870/5
= 174
first fill 3quart pail and pour in 5quart pail.fill again 3
quart pail and fill remaining 2 quarts in 5 quart
pail.hence 1 quart remains in 3quart pail.empty 5quart pail
and pour 1 quart from 3 quart pail. also add another 3
quart from 3 quart pail. hence 1 + 3 quarts = 4 quarts.
30%
suppose the area is 100 and it was increased by 69%, then
the area is 169 which it indicates the side of the square
is 13.. which means 30% increase in its side.
1, 2, 6, 15, 31, 56, 91
91
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
3, 7, 15, 27, 63, 127, 255
B. 27
( Number × 2 ) + 1
3 × 2 + 1 = 7
7 × 2 + 1 = 15
15 × 2 + 1 = 31 ( not 27 )
31 × 2 + 1 = 63
63 × 2 + 1 = 127
127 × 2 + 1 = 255
FASHION= FOIHSAN
It is F-ASHIO-N to F-OIHSA-N.
So PROBLEM will be P-ROBLE-M,
the answer is PELBORM.
1.26
heat loss from a surface can be reduced by polishing the surface coz polished surface is bad radiator and bad absorber of heat
1/10 + 1/12 -1/20 = 15/2 i.e 7.5 h means 7 h & 30 min
A can give B (5 min – 4 1/2 min) = 30 sec start.
The distance covered by B in 5 min = 1000 m.
Distance covered in 30 sec = (1000 * 30)/300 = 100 m.
A can give B 100m start.