Assessfirst Interview Questions, Process, and Tips

Ques:- You have 2 candles of equal size and a lighter. The candles can burn 1 hour each. You have to measure 90 minutes with these candles. There is no scale or clock?
Ques:- How do you feel about the working hours from 9 to 5?
Ques:- What skills does a leader need to have? why?list the steps you would take in building up a team? how about a team with low morale?what do you do to prioritized on a given workday?
Ques:- A can run a kilometer race in 4 1/2 min while B can run same race in 5 min. How many meters start can A give B in a kilometer race, so that the race mat end in a dead heat?
Recent Answer : Added by Abhi Chatterjee On 2022-01-08 16:05:14:

A can give B (5 min – 4 1/2 min) = 30 sec start.
The distance covered by B in 5 min = 1000 m.
Distance covered in 30 sec = (1000 * 30)/300 = 100 m.
A can give B 100m start.

Ques:- A company installed 36 machines at the beginning of the year. In March they installed 9 additional machines and then disconnected 18 in August. How many were still installed at the end of the year.
Recent Answer : Added by Admin On 2020-05-17 12:01:31:

27

Ques:- Find the average of the series : 312, 162, 132, 142 and 122?
Recent Answer : Added by L.Lalitha priya On 2022-05-17 08:56:37:

Sum of all numbers in series= 870 (I.e 312+162+132+142+122)
Average=sum of numbers/count of numbers
Average= 870/5
= 174

Ques:- How many companies from India found place in ?Global-500? list ?
Ques:- How many family members does your family comprises of?
Ques:- Do you consider yourself to be thoughtful, analytical or do you usually make up your mind fast? Give an example. (Watch time taken to respond)
Ques:- If you had an infinite supply of water and a 5 quart and 3 quart pail, how would you measure exactly 4 quarts?
Recent Answer : Added by Admin On 2020-05-17 12:01:39:

first fill 3quart pail and pour in 5quart pail.fill again 3
quart pail and fill remaining 2 quarts in 5 quart
pail.hence 1 quart remains in 3quart pail.empty 5quart pail
and pour 1 quart from 3 quart pail. also add another 3
quart from 3 quart pail. hence 1 + 3 quarts = 4 quarts.

Ques:- If the area of the sqaure is increased by 69 % how much the length of the side will increase?
Recent Answer : Added by Admin On 2020-05-17 12:02:33:

30%
suppose the area is 100 and it was increased by 69%, then
the area is 169 which it indicates the side of the square
is 13.. which means 30% increase in its side.

Ques:- Find out the wrong number in each sequence:
1, 2, 6, 15, 31, 56, 91
A. 15
B. 31
C. 56
D. 91
Recent Answer : Added by Emmanuel On 2022-05-17 09:08:51:

91

Ques:- What do u do after losing current job withougt information ?
Ques:- The food in a camp lasts for 30 men for 40 days. If ten more men join, how many days will the food last?
Ques:- India faces frequent power cut. Still why don’t the mosquito repellent companies(like All Out,Good Night) don’t provide an additional option of battery which will be used when the power is cut?
Ques:- Why do you think you are smart?
Ques:- A,B and C needs 8, 12 and 16 days respectively to finish a task. How many days will it take if A works for 2 days then B works on it until 25% of the job is left for C to do, and C completes the work?
Recent Answer : Added by Deven Sharma On 2023-05-31 18:36:37:

To solve this problem, we can break it down into steps:

Step 1: Determine the individual rates of work for A, B, and C.

If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.

Step 2: Calculate the combined work rate of A and B.

If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.

Step 3: Calculate the time it takes for B to complete 75% of the task.

Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.

Step 4: Calculate the remaining work for C.

If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.

Step 5: Calculate the time it takes for C to complete the remaining work.

Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.

Step 6: Calculate the total time required.

A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.

Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.

Ques:- Find out the wrong number in the series:
3, 7, 15, 27, 63, 127, 255
A. 7
B. 27
C. 63
D. 127
Recent Answer : Added by Yogesh On 2022-03-09 16:46:03:

B. 27

( Number × 2 ) + 1
3 × 2 + 1 = 7
7 × 2 + 1 = 15
15 × 2 + 1 = 31 ( not 27 )
31 × 2 + 1 = 63
63 × 2 + 1 = 127
127 × 2 + 1 = 255

Ques:- Do you need any holidays or leave during the probation period?
Ques:- What animal best represents you and why?
Ques:- If in a certain language FASHION is coded as FOIHSAN, how is PROBLEM coded in that code ?
Recent Answer : Added by Sowji On 2022-05-17 08:54:19:

FASHION= FOIHSAN
It is F-ASHIO-N to F-OIHSA-N.
So PROBLEM will be P-ROBLE-M,
the answer is PELBORM.

Ques:- How do you determine or evaluate success?
Ques:- Explain the problem of synchronisation of the CPU with the input_output devices
Ques:- Excluding stoppages, the speed of a bus is 54 kmph and including stoppages it is 45 kmph. For how many minutes does the bus stop per hour?
Ques:- What qualities do you look for in a boss?
Ques:- The cost of an item is Rs 12.60. If the profit is 10% over selling price what is the selling price ?
Recent Answer : Added by Ajay On 2022-09-15 16:39:04:

1.26

Ques:- heat loss from a surface can be minimized by?
Recent Answer : Added by Namrata On 2021-07-25 09:41:13:

heat loss from a surface can be reduced by polishing the surface coz polished surface is bad radiator and bad absorber of heat

Ques:- Describe your involvement in re engineering down-sizing or cost containment processes?
Ques:- Two pipes can fill a tank in 10 and 12 hours respectively while third pipe will make the tank empty in 20 hours. If all three pipes operate simultaneously, in how many hours the tank will be filled ?
Recent Answer : Added by Admin On 2020-05-17 12:01:50:

1/10 + 1/12 -1/20 = 15/2 i.e 7.5 h means 7 h & 30 min

Ques:- If you get into Google, which products you would like to work on?

Contact with us regarding this list

Devendra Bhardwaj With a decade of experience as a Job Hiring Expert, I am a results-driven professional dedicated to elevating recruitment strategies. My expertise lies in navigating the dynamic landscape of talent acquisition, employing innovative approaches to attract, assess, and secure top-tier candidates. I excel in optimizing hiring processes, leveraging cutting-edge technologies, and fostering collaborative relationships with stakeholders. A keen understanding of industry trends allows me to stay ahead, ensuring a competitive edge in securing the best talent for your organization. I am passionate about connecting the right people with the right opportunities and thrive in creating impactful, streamlined recruitment solutions.

Scroll to top