Thermopac Interview Questions, Process, and Tips

Ques:- HR round about my self etc
Ques:- By what % New price of wardrobe has to be increased to get original value, if it was decreased by 20%
Ques:- What things give you the greatest satisfaction at work?
Ques:- Why are you doing job?
Ques:- A 260 meter long train crosses a 120 meter long wall in 19 seconds. What is the speed of the train?
A. 27 km/hr
B. 49 km/hr
C. 72 km/hr
D. 92 km/hr
Recent Answer : Added by anjaneyulu On 2022-11-08 16:21:53:

72 kmph

Ques:- Can you describe for me a difficult obstacle you have had to overcome? How did you handle it? How do you feel this experience affected your personality or ability?
Ques:- what will be reminder after (16)^15 is devided by the 254…
A. 2
B. 0
C. 1
D. 128
Recent Answer : Added by Damodharan M On 2023-05-22 03:48:14:

I need a answers from hakuna matata questions

Ques:- Program in C for factorial of a given number
Ques:- Two trains of equal length when moving in opposite direction takes 5 sec. to cross each other completely and when moving in same direction takes 15 sec. Find the ratio of their speed.
Recent Answer : Added by Deven Sharma On 2023-05-31 18:18:48:

Let’s assume the length of each train is ‘L’ and the speeds of the two trains are ‘V₁’ and ‘V₂’ respectively.

When the trains are moving in the opposite direction, their relative speed is the sum of their individual speeds. The total distance they need to cover is the sum of their lengths. Since they cross each other completely in 5 seconds, we can set up the following equation:

(V₁ + V₂) × 5 = 2L

When the trains are moving in the same direction, their relative speed is the difference between their individual speeds. The total distance they need to cover is the difference between their lengths. Since they cross each other completely in 15 seconds, we can set up the following equation:

(V₁ – V₂) × 15 = 2L

Now, let’s solve these equations to find the ratio of their speeds.

From the first equation, we have:
(V₁ + V₂) × 5 = 2L
V₁ + V₂ = (2L) / 5

From the second equation, we have:
(V₁ – V₂) × 15 = 2L
V₁ – V₂ = (2L) / 15

Let’s add these two equations together:
V₁ + V₂ + V₁ – V₂ = (2L) / 5 + (2L) / 15
2V₁ = (6L + 2L) / 15
2V₁ = (8L) / 15
V₁ = (4L) / 15

So, the speed of the first train is (4L) / 15.

Now, let’s substitute this value back into the first equation to find V₂:
(4L) / 15 + V₂ = (2L) / 5
V₂ = (2L) / 5 – (4L) / 15
V₂ = (6L – 4L) / 15
V₂ = (2L) / 15

Therefore, the speed of the second train is (2L) / 15.

The ratio of their speeds is given by:
(V₁ / V₂) = ((4L) / 15) / ((2L) / 15)
(V₁ / V₂) = 4L / 2L
(V₁ / V₂) = 2

So, the ratio of their speeds is 2:1.

Ques:- A man rows to a place 48 km distant and come back in 14 hours. He finds that he can row 4 km with the stream in the same time as 3 km against the stream. The rate of the stream is:
Recent Answer : Added by shashank chourasiya On 2022-03-09 16:42:05:

Hint: Assume that the speed of the stream is x and the speed of the boat in still water is x. From the statement of the question form two equations in two variables x and y. This system is reducible to linear equations in two variables. Reduce the system to a system of linear equations in two variables by proper substitutions. Solve the system of equations using any one of the methods like Substitution method, elimination method, graphical method or using matrices. Hence find the value of x satisfying both the equation. The value of x will be the speed of the stream.
Complete step-by-step answer:
Let the speed of the stream be x, and the speed of the boat in still water be y.
We have the speed of the boat upstream = y-x.
Speed of the boat downstream = y+ x.
Now since it takes 14 hours to reach a place at a distance of 48 km and come back, we have the sum of the times taken to reach the place downstream and time taken to return back upstream is equal to 14.
Now, we know that time =Distance speed
Using, we get
Time taken to reach the place =48y+x and the time taken to return back =48y−x.
Hence, we have
48y+x+48y−x=14
Dividing both sides by 2, we get
24y+x+24y−x=7 —–(i)
Also, the time taken to cover 4km downstream is equal to the time taken to cover 3km upstream.
Hence, we have 4y+x=3y−x
Transposing the term on RHS to LHS, we get
4y+x−3y−x=0 ——– (ii)
Put 1y+x=t and 1y−x=u, we have
24t+24u=7 ——-(iii)4t−3u=0 ——–(iv)
Multiplying equation (iv) by 6 and subtracting from equation (iii), we get
24t−24t+24u+18u=7⇒42u=7
Dividing both sides by 42, we get
u=742=16
Substituting the value of u in equation (iv), we get
4t−3(16)=0⇒4t−12=0
Adding 12 on both sides, we get
4t=12
Dividing both sides by 4, we get
t=18
Reverting to original variables, we have
1y+x=18 and 1y−x=16
Taking reciprocals on both sides in both equations, we have
y+ x=8 ——- (v)y−x=6 ——–(vi)
Adding equation (v) and equation (vi), we get
2y=14
Dividing both sides by 2, we get
y=7.
Substituting the value of y in equation (v), we get
7+x=8
Subtracting 7 from both sides we get
x = 8-7 =1
Hence the speed of the stream is 1 km/hr.

Ques:- Describe briefly your standards for success?
Recent Answer : Added by Stephanie Brewer On 2022-01-08 16:07:08:

My standard for success is to build confidence, be able to earn money, and meet people.

Ques:- 8 man work for 6 days to complete a work. How many men are required to complete same work in 1/2 day.
Recent Answer : Added by Srija On 2021-03-31 15:32:39:

8men=6days
Xmen=1/2days
M1=8,D1=6
M2=X,D2=1/2
Formula:
M1*D1=M2*D2
8*6=X*(1/2)
X=8*6*2
X=96
Answer=96

Ques:- Do you know anyone who works for us?
Ques:- The average temperature for Monday, Tuesday, Wednesday and Thursday was 48 degrees and for Tuesday, Wednesday, Thursday and Friday was 46 degrees. If the temperature on Monday was 42 degrees. Find the temperature on Friday?
Recent Answer : Added by Vigneshkarthik On 2022-05-17 09:07:59:

40

Ques:- A person pays a tax of 10%,if his salary increases by 10% he need to pay a tax of 15%.The total gain he obtains after increment in salary is 350Rs . What is his salary?
Recent Answer : Added by Admin On 2020-05-17 12:04:35:

7000

Ques:- How to introduce ourselves
Ques:- C++, DS, Java, .Net, hardware and Networking
Ques:- Here are infinite black and white dots on a plane. Prove that the distance between one black dot and one white dot is one unit?
Ques:- Explain how would be an asset to this organization?
Ques:- Have you taken a management development course?
Ques:- What all are your work experiences?
Ques:- There are 50 families in a village each consisting of a husband and a wife. Each woman knows all the men who are thieves except her husband. Now the king announces that there is at least one thief in the village. What happens then?
Ques:- ?SAFMA? is associated with?
Ques:- How many shots of 1cm radius can be prepared from a sphere of 3cm radius?
Ques:- Why you looking change
Ques:- 27(deg) 6' 43.15"
45(deg) 31' 4.3"
THEN WHAT WILL BE THE DEGREE WHEN TIME IS 3 O CLOCK
Recent Answer : Added by 9074743593 On 2021-07-29 16:19:44:

90 degree

Ques:- Checked communication skills
Ques:- What motivates you to do good job?
Ques:- What’s your dream job?
Ques:- What have you done to improve your knowledge in the last year?

Contact with us regarding this list

Devendra Bhardwaj With a decade of experience as a Job Hiring Expert, I am a results-driven professional dedicated to elevating recruitment strategies. My expertise lies in navigating the dynamic landscape of talent acquisition, employing innovative approaches to attract, assess, and secure top-tier candidates. I excel in optimizing hiring processes, leveraging cutting-edge technologies, and fostering collaborative relationships with stakeholders. A keen understanding of industry trends allows me to stay ahead, ensuring a competitive edge in securing the best talent for your organization. I am passionate about connecting the right people with the right opportunities and thrive in creating impactful, streamlined recruitment solutions.

Scroll to top