C is grand child of A
Answer: 66.67 km approx.
Solution:
Let the first train A move at u km/h.
Let the second train B move at v km/h.
Let the distance between two trains be d km
Let the speed of bee be b km/h
Therefore, the time taken by trains to collide = d/(u+v)
Now putting all the known values into the above equation, we get,
u = 50 km/hr
v = 70 km/hr
d = 100 km
b = 80 km/hr
Therfore, the total distance travelled by bee
= b*d/(u+v)
= 80 * 100/(50+70)
= 66.67 km (approx)
24*4= x(x+4)
solve this
answer is x=8
X+4= 12
madras
Let A=5x,B=3x,C not given so consider C=x
In triangle total angle=180°
A+B+C=180°
5x+3x+x=180°
9x=180°
X=180°/9
X=20°
A=5(20)=100°
B=3(20)=60°
C=20°
Therefore A=100° is the largest angle
Ans: 100°
(130+x)/30=(45×5/18)
245 meters
How breadth is 19.84..?
Apply Pythagoras therom,
a^2+b^2=c^2,
Lets Assume
c is hypotenuse or diagonal,
a is length or opposite side,
b is breadth or adjacent side,
Then,
256+b^2=400
b^2=144
b=12,
So the breadth is 12 cm
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
R
T,P,R,Q,S
1
we need to take half tabulate among the 4 tablets. den it ll be like 1 tabulate is of fever and one tabulate is of cough
these components can be used to add specialized
functionality, such as animation or pop-up menus, to Web
pages, desktop applications, and software development tools.
Its Alphabet “e”
(3)^ 7.5 ÷ (27)^1.5 x (9)^2 = 3?
⇒(3)^7.5 ÷ {(3)^(3 x 1.5)} x {(3)^(2 x 2)} = 3 ?
⇒ 3^(7.5 – 4.5 + 4) = 3?
⇒ 3^7 = 3?
⇒ ? = 7
66 seconds
answer is one