let the for digit number be = pqrs
p=q/3 ==>q = 3p
r=p+q=p+3p =4p
s=3q = 3(3P)=9p
number:
p 3p 4p 9p
let p=1 answer is 1349
if it 2 answer 2 6 8 18
so it becomes five digit number so correct answer is 1349
343 : 729 :: 125 : ?
7^3 : 9^3 :: 5^3:7^3
12 %
225
28
to arrange m objects in n places => nCm
i.e. for this example m=2(+,- sign) and n = 8(places between two number from 1 to 9)
SO, answer is : 8C2 = (8*7) / 2 = 28
Previous their age was 21 and 18 respectively
Presently, after 6 years the age is 27 and 24.
(C*D)/G
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
Mr. Brown painted the first whole house in 6 days plus 1/3 of the second house in the next 2 days. Mr. Black can paint a whole house in 8 days and had 8 days to work, so he painted the equivalent of 1 whole house. That accounts for 2-1/3 houses painted. Mr. Blue only needs to paint 2/3 of the last house, so 2/3 times 12 days equals 8 days.
Let the total number of matches to played in the tournament be ‘x’.
Given that A county cricket team has won 10 matches and lost 4.
That means total number of matches played = 14.
So,
= > 70% of x = 14
= > (70/100) * x = 14
= > 70x = 1400
= > x = 20.
So, the number of matches to be played = 20.
They have a record of exactly 75% wins = 20 * 75/100
= > 15.
Therefore, the number of matches should the team win = 15 – 10 = 5.
Hope this helps!
I can join your company with in one month that is my notice period time