Purdue university college of veterinary medicine & veterinary teaching hospital Interview Questions, Process, and Tips

Ques:- You are given weights of order 1kg 3kg 9kg 27kg 81kg and so on…(powers of 3)A weight of N kg is placed on any one of the empty pans of the balance.You are supposed to add weights to both pans of the balance and make them equal.You can use one weight only once..i.e., you can't use 2 number of 3kg weights.
Ques:- What you learned from MBA
Ques:- What are your interest?
Ques:- How committed do you think you will be to this position?
Ques:- A watch was sold at a loss of 10%. If it was sold for Rs.140 more, there would have been a gain of 4%. Find the cost price?
Ques:- The egg vendor calls on his first customer and sells half his eggs and half an egg. To the second customer, he sells half of what he had left and half an egg and to the third customer he sells half of what he had then left and half an egg. By the way he did not break any eggs. In the end three eggs were remaining . How many total eggs he was having ?
Recent Answer : Added by Deepesh Parmar On 2021-12-10 16:35:05:

31

Ques:- In a hotel, rooms are numbered from 101 to 550. A room is chosen at random. What is the probability that room number starts with 1, 2 or 3 and ends with 4, 5 or 6?
Ques:- A,B and C needs 8, 12 and 16 days respectively to finish a task. How many days will it take if A works for 2 days then B works on it until 25% of the job is left for C to do, and C completes the work?
Recent Answer : Added by Deven Sharma On 2023-05-31 18:36:37:

To solve this problem, we can break it down into steps:

Step 1: Determine the individual rates of work for A, B, and C.

If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.

Step 2: Calculate the combined work rate of A and B.

If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.

Step 3: Calculate the time it takes for B to complete 75% of the task.

Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.

Step 4: Calculate the remaining work for C.

If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.

Step 5: Calculate the time it takes for C to complete the remaining work.

Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.

Step 6: Calculate the total time required.

A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.

Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.

Ques:- In the Tour de France, what is the position of a rider, after he passes the second placed rider?
Recent Answer : Added by Ashish Makhija On 2022-08-14 16:35:56:

Second

Ques:- Communication system
Ques:- X, Y and Z can do a work in 6, 8 and 12 days respectively doing the work together and get a payment of Rs.1800. What is Y’s share?
Ques:- Why there is so many digit in Indian mobile number, but so much less in other countries such as Bangladesh.
Ques:- Showing the man receiving the prize, Saroj said, “He is the brother of my uncle’s daughter.” Who is the man to Saroj?
Recent Answer : Added by Stephen chibuike Joel On 2022-03-09 16:40:01:

Cousin

Ques:- The average temperature for Monday, Tuesday, Wednesday and Thursday was 48 degrees and for Tuesday, Wednesday, Thursday and Friday was 46 degrees. If the temperature on Monday was 42 degrees. Find the temperature on Friday?
Recent Answer : Added by Vigneshkarthik On 2022-05-17 09:07:59:

40

Ques:- area of triangle=1/2*b*h base incresed by 4 times & height is devided by 2, the net effect of area.
Recent Answer : Added by Admin On 2020-05-17 12:00:14:

area is doubled.
actual area = 1/2 bh
after increase area = 1/2 *4b* h /2
=bh
1/2 *bh *2 = bh
therefore area is doubled

Ques:- What if the interviewer ask that we are offering 8000 onlybut if the another company is offering 10000 means to whichyou would like to go?
Ques:- Why might you be successful in such a job?
Ques:- A cube of side 4cm is painted with colors red,blue,green in such a way that opposite sides are painted in the same colour . this cube is now cut into 64 cubes of equal size .then 1) how many have atleast two sides painted in different colours.2) how many cubes have only one side painted.3) how many cubes have no side painted4) how many have exactly one side not painted.
Ques:- The smallest number when increased by ” 1 ” is exactly divisible by 12, 18, 24, 32 and 40 is:
Recent Answer : Added by Mahesh On 2021-07-30 16:30:08:

lcm (12,18,24,32,40) – 1
1440-1 = 1439

Ques:- Why u choose MBA after doing graduation in science stream?
Recent Answer : Added by Roshan R Raja V On 2022-03-09 16:30:49:

MBA refers to Master Of Business application, so that the line says as well our day to day life is also consider as an business, and second by science stream but why not in other, it depends on the capacity of student and smart move kind off.

Ques:- How to properly answer What is your motivation to make a career/job change ?
Ques:- How much interest can a person get on Rs. 8200 at 17.5% p.a. simple interest for a period of two years and six months?
Ques:- The work is very hard then how to overcome stress?
Ques:- What is your expectation to our company? and what is myexpectation from you?
Ques:- There is a frog who can make jumps of length 3,5,7. There are stones in a river at distances a1, a2 an. The other end of the stream is n distance away. Can the frog cross the stream. What if the frog can make jumps backwards ?
Ques:- what is your approach to working under pressure?
Recent Answer : Added by Admin On 2020-05-17 12:05:57:

under pressure a person more effort to his work

Ques:- You are a CA would you like to report to a B.Com having experience more than you
Ques:- Farmer Jones sold a pair of cows for Rs. 210. He made a profit of 10% on one, and on the other he lost 10%. Altogether he made a profit of 5%. How many did each cow originally cost him?
Ques:- In each questions below are given two statements followed by two conclusions numbered I and II.
Statements :
All film stars are playback singers. All film directors are film stars.
Conclusions :
I. All film directors are playback singers.
II. Some film stars are film directors.
A. if only conclusion I follows
B. if only conclusion II follows
C. if either conclusion I or II follows
D. if neither conclusion I nor II follows
E. if both conclusions I and II follow
Recent Answer : Added by Anirban Saha On 2022-09-22 16:41:15:

Both conclusion follows

Ques:- if a car starts from A towards B with some velocity due to some problem in the engine afetr travelling 30 km .if the car goes 4/5 th of its of actual velociteythe car reaches B 45 min later to the actual time.if the car engine fails after travelling 45km the car reaches the destination B 36min late to the actual time ,wat is the initial velocity of car and what is the distance between A and B on km.
Recent Answer : Added by Admin On 2020-05-17 12:04:29:

20&130

Contact with us regarding this list

Devendra Bhardwaj With a decade of experience as a Job Hiring Expert, I am a results-driven professional dedicated to elevating recruitment strategies. My expertise lies in navigating the dynamic landscape of talent acquisition, employing innovative approaches to attract, assess, and secure top-tier candidates. I excel in optimizing hiring processes, leveraging cutting-edge technologies, and fostering collaborative relationships with stakeholders. A keen understanding of industry trends allows me to stay ahead, ensuring a competitive edge in securing the best talent for your organization. I am passionate about connecting the right people with the right opportunities and thrive in creating impactful, streamlined recruitment solutions.

Scroll to top