ANS = 24.
16 = 2^4
24 = 2^3 x 3
H.C.F of 16 and 24 = 8
L.C.M will be 48
16 poles per min
48kmph=48000 meters per hr
=800 meters per min
800/50=16 poles per min
Answer:
11 days.
Step-by-step explanation:
In the question,
Time taken by Ramesh to finish a piece of work = 20 days
Time taken by Sushil to finish a work = 25 days
Time for which they worked together = 5 days
Sushil left after = 5 days
So,
One day work of Ramesh is,
One day work of Sushil is,
So,
Work done in 5 days is given by,
Therefore, Remaining work is given by,
Now, as the Sushil left the remaining work was done by Ramesh,
Time taken by Ramesh for the remaining work is,
Therefore, the remaining work will be completed in 11 days by Ramesh.
5 + 6 + 7 + 8 + 9 = 35 so two primes 5 and 7.
– While the train is moving, the jogger will also be running in the same direction.
– for the head(engine) of the train to get to the current position of the jogger 240m away, it will take:
45km/hr => 12.5m/s => 240/12.5 = 19.2 seconds.
– But in the same period of time, the jogger will still be running and will have moved to a new location by: 9km/hr => 2.5m/s => 2.5 * 19.2 = 48m
To get to the new location at the speed of 12.5m/s will take the train:
48/12.5 = 3.84sec
In this additional time, the jogger will move forward by:
3.84 * 2.5 = 9.6m
at a speed of 12.5m/s, it will take the train less than a second to cover the additional 9.6m
If we add the distance the jogger will cover in 1 second to 9.6, it is still less than what the train can cover per second. let us see (9.6 + 2.5 = 12.1)
Therefore, the head of the train will pass the runner at approximately: 19.2 + 3.84 + 1 => 24.04 seconds.
For the train to completely pass the runner, it will need its whole length of 120m to be in front of the runner.
This will take an additional (9.6 + 2) seconds.
Therefore for the length of the train to be ahead of the runner it will take approx. 35.65 (24.04 + 9.6 + 2) seconds
let A goes up and B comes down.
assume A takes 1 step in 1sec.
hence,B takes 5 steps in 1sec.
50 steps ll be moved by A in 50/1=50secs
125 steps ll be moved by B in 125/5=25 secs
hence speed of escalator=(difference of no of
steps)/(difference of time)
speed=(125-50)/(50-25)= 3 steps/sec
hence during upward journey of 50secs by A,total steps=50 by
A and 150 by escalator..total=150+50=200
during downward journey of 25 secs by B,total steps=125 by B
and 75 by escalator..total=125+75=200steps.
ANS:200 steps
Rs. 1500
Now as per question, Kamal invested for 12 months and Sameer invested for 7 months.
So, Kamal:Sameer=(9000×12):(8000×7)
=108.56=27:14
Sameer ratio in profit will be =6970×4114=Rs.2380