Kalp Tech Solutions Interview Questions, Process, and Tips

Ques:- There are four prime numbers written in ascending order of magnitude. The product of the first three is 385 and of the last three is 1001. Find the fourth number?
Recent Answer : Added by GURUKISHORE On 2021-09-18 16:12:09:

13

Ques:- Basics of our subjects in cse dept
Ques:- A starts from a place at 11.00 am and travels at a speed of 4 kmph , B starts at 1.00 pm and travels with speeds of 1 kmph for 1 hr , 2 kmph for the next hr , 3 kmph for the next hr and so on. At wht time will B catch up with A ?
Recent Answer : Added by DK BOSS On 2021-07-17 06:18:40:

the answer is At 9:48 PM
At 1:00 pm the difference between A & B = 8 km
after 2:00 pm ………………. = 11 km (as B’s speed
is 1 and A’s 4 km, then eqv speed=(4-1)=3 km)
After 3:00………………….. = 13 km (as B’s speed 2 km)
After 4:00………………….. = 14 km
after 5:00………………….. = 14 km (A’s speed= B’s
speed)
after 6:00………………….. = 13 km
after 7:00………………….. = 11 km
after 8:00………………….. = 8 km
after 9:00………………….. = 4 km
and now the eqv speed is= (9-4) =5 km/hr;
and the renaming distance is 4 km;
then, time=(60*4)/5=48 min;
then the meeting time is=9:00+48 min=9:48 pm;

Ques:- Regarding business profile
Ques:- Product wise
Ques:- HOW CAN U SAY TIME IS MONEY.
Ques:- Why do you want to work for this company?
Ques:- At what time after 4.00 p.m. is the minutes hand of a clock exactly aligned with the hour hand?
Ques:- Are you willing to work at night?
Recent Answer : Added by jackson On 2022-11-29 17:07:09:

yes

Ques:- Regarding Last job’s experience
Ques:- How many experaice you have
Ques:- What is your position?
Ques:- 55*55*55+45*45*45/55*55-55*45+45*45
Recent Answer : Added by Admin On 2020-05-17 12:02:28:

100

Ques:- One side of a rectangular field is 4 m and its length along diagonal is 5 m. What is the area of the field?
Recent Answer : Added by Aditya D On 2022-09-21 16:49:44:

area is given by Area of Rectangle = Length of Rectangle*(sqrt((Diagonal of Rectangle^2)-(Length of Rectangle^2)))
so substituting we get area=4*(sqrt((25-16)))
area=4*(sqrt(9))
since area cannot be negative hence we take sqrt of 9 as 3 (as sqrt of 9 is 3 and -3 as well)
area=4*3=12m^2

Ques:- What is the missing number in 56 / 7 = ? – 5
Recent Answer : Added by Hakeem Nazia Begum On 2022-09-22 16:40:09:

13

Ques:- In an exam, Amar scored 64 percent, Bhavan scored 36 percent and Chetan 44 percent. The maximum score awarded in the exam is 800. Find the average mark scored by all the three boys?
Recent Answer : Added by Atif On 2022-12-05 16:13:45:

600

Ques:- There are two balls touching each other circumferencically. The radius of the big ball is 4 times the diameter of the small all. The outer small ball rotates in anticlockwise direction circumferencically over the bigger one at the rate of 16 rev/sec. The bigger wheel also rotates anticlockwise at N rev/sec. What is 'N' for the horizontal line from the centre of small wheel always is horizontal.
Recent Answer : Added by vignesh On 2021-03-20 17:32:38:

64

Ques:- Can you talk about your life in a summary?
Ques:- A pipe can fill a tank in 30 min B can fill in 28 min then if 3/4 th of tank can be filled by B pipe and after wards both are opened then how much time is required by both the pipes to fill the tank completely.
Recent Answer : Added by Admin On 2020-05-17 12:00:13:

105/29 mins

Ques:- Were you not satisfied with the old company
Ques:- Two pipes function simultaneously the reservoir will be filled in 12 hours. One pipe fills reservoir 10 hours faster than the other. How many hours does the faster pipe take to fill the reservoir?
Recent Answer : Added by Manik rattan On 2021-08-16 06:56:14:

suppose
pipe:
A -30 hours A’s effeciency (60/30) =2
60( lcm of 30 and 20)
B- 20 hours B’s effeciency (60/20)=3

time taken by both to fill = 60/5 =12 as given in question (effeciencies of both a+b =2+3=5)
time taken by faster pipe i.e b = 60/3 =20

Ques:- How many lines can be drawn in a 2D plane such that they are equidistant from 3 non-collinear points ?
Ques:- If in a certain language, COUNSEL is coded as BITIRAK, how is GUIDANCE written in that code ?
Recent Answer : Added by Avanti On 2021-06-09 16:17:08:

FUHAZIBA

Ques:- A train passes a man standing on the platform. If the train is 170 meters long and its speed is 72 kmph, how much time it took in doing so?
Ques:- Regarding my family background
Ques:- Tell me about a time when you overcame a challenge?
Ques:- 6897 is divisible by
A. 11 only
B. 19 only
C. both 11 and 19
D. neither 11 nor 19
Recent Answer : Added by Raimi Rafiu On 2022-09-15 16:36:47:

11

Ques:- Where are you working presently?
Recent Answer : Added by Sivaraman On 2022-09-22 16:40:02:

I am working institute

Ques:- You have 4218 no of balls. put 1 balls at top layer 3 at 2nd top layer then 6 and then 10 … Continue in this way. How many layers are possible.?
Recent Answer : Added by xyz On 2021-07-31 16:35:47:

211

Ques:- Can you name three consecutive days without using the words Wednesday, Friday, or Saturday?
Recent Answer : Added by Shweta Gupta On 2022-09-02 17:03:06:

Sunday
Monday
Tuesday

Contact with us regarding this list

Devendra Bhardwaj With a decade of experience as a Job Hiring Expert, I am a results-driven professional dedicated to elevating recruitment strategies. My expertise lies in navigating the dynamic landscape of talent acquisition, employing innovative approaches to attract, assess, and secure top-tier candidates. I excel in optimizing hiring processes, leveraging cutting-edge technologies, and fostering collaborative relationships with stakeholders. A keen understanding of industry trends allows me to stay ahead, ensuring a competitive edge in securing the best talent for your organization. I am passionate about connecting the right people with the right opportunities and thrive in creating impactful, streamlined recruitment solutions.

Scroll to top