A
c
P+R=200
Q+R=350
+
—————-
P+Q+2R=550
P+Q+R=500
–
____________
R=50
D. Vice President
.
Question is not completed
The letters A, B, C, D, E, F and G, not necessarily in that order, stand for seven consecutive integers from 1 to 10
D is 3 less than A
B is the middle term
F is as much less than B as C is greater than D
G is greater than F
1. The fifth integer is
(a) A
(b) C
(c) D
(d) E
(e) F
ans:a
2.A is as much greater than F as which integer is
less than G
(a) A
(b) B
(c) C
(d) D
(e) E
ans:a
3. If A = 7, the sum of E and G is
(a) 8
(b) 10
(c) 12
(d) 14
(e) 16
4. An integer T is as much greater than C as C is
greater than E. T
can be written as A + E. What is D?
(a) 2
(b) 3
(c) 4
(d) 5
(e) Cannot be determined
ans:a
132
The local value of 7 in the number is at 10000 so 7×10000 and face of 7 is 7
So 70000 -7 so the answer is C 69993
Ramu’s Mother-in-law means Ramu’s wife’s mother
Only daughter means Ramu’s wife
And daughter’s son means Ramu’s Son
Answer : Son
22
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
I am Srilaxmi. I born and bought-up in WARANGAL. My father Agriculture cum politician and my Mom homemaker. I blessed with three brothers and one sister. My elder brother was married and working as a TA in MPDO office at Warangal. My first younger brother was also married and working with Sushee Infra Pvt Ltd as a Asset Manager at Hyderabad. Younger brother and sister are into their studies. Coming to me I completed my MBA from ICFAI university in 2008 and worked as a Audit assistant in accounting firm for two years. I had actively participated in bank audits i.e. is in CBI (Concurrent audit) and SBI(Statutory audit) during my services. Later I pursued CS Executive and attempted for five times then I give up to clear my M.Com. At present I was studying postal studies of CS Executive programme. My hobbies are reading books and listening to music.