1
the qs here is talking about 50 states in USA.So if u remove
one from 50, which one would it be is the qs!!!
u should answer as either u would remove the state with
lowest population or state with less natural resources or
some thing else..
124, 133, 142, 152, 160
2 minuts the speed ofthe train
21
How breadth is 19.84..?
Apply Pythagoras therom,
a^2+b^2=c^2,
Lets Assume
c is hypotenuse or diagonal,
a is length or opposite side,
b is breadth or adjacent side,
Then,
256+b^2=400
b^2=144
b=12,
So the breadth is 12 cm
Take one fruit from box with label mixture. If we see
orange, because the basket lies (it cant have a mixture),
then it has only oranges. The other 2 are labeled apples and
oranges. The one labeled apples,
cannot have oranges inside, cos they are allready been
identified, and because it lies, it cannot have apples either.
So it has a mixture. And we are left with the one labeled
oranges that lies and has apples.
1261
17.9
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
8400
the answer is 34
500
30+2=32
#1: N = 1, f(N) = 1
#2: N = 199981, f(N) = 199981
#3: N = 199982, f(N) = 199982
#4: N = 199983, f(N) = 199983
#5: N = 199984, f(N) = 199984
#6: N = 199985, f(N) = 199985
#7: N = 199986, f(N) = 199986
#8: N = 199987, f(N) = 199987
#9: N = 199988, f(N) = 199988
#10: N = 199989, f(N) = 199989
#11: N = 199990, f(N) = 199990
#12: N = 200000, f(N) = 200000
#13: N = 200001, f(N) = 200001
#14: N = 1599981, f(N) = 1599981
#15: N = 1599982, f(N) = 1599982
Employee Performance Standards. Employee performance measurements can determine an employee’s compensation, employment status or opportunities for advancement.
Clarke is 80 years old
224