Hawaiian electric company Interview Questions, Process, and Tips

Ques:- What was the first polyester fiber invented in 1941 called?
A. Terylene
B. Poplin
C. Terry cot
D. Rubia
Recent Answer : Added by Sushmitha On 2020-12-09 15:07:33:

A

Ques:- Given a collection of points P in the plane , a 1-set is a point in P that can be separated from the rest by a line, .i.e the point lies on one side of the line while the others lie on the other side. The number of 1-sets of P is denoted by n1(P)….
Ques:- The letters A, B, C, D, E, F and G, not necessarilyin that order,stand for seven consecutive integers from 1 to 10D is 3 less than AB is the middle termF is as much less than B as C is greater than DG is greater than F1. The fifth integer is?
Recent Answer : Added by Biplab Nath On 2021-07-30 16:26:16:

C

Ques:- Give an example where you had aproblem on the job, and tell me how you solved the problem. and the finalvoutcome.
Ques:- What are your career aspirations?
Ques:- What was the name of first bank established in India ?
Recent Answer : Added by shubham On 2022-04-02 06:57:58:

bank of calcutta originated in 1806
there is another answer such as
bank of hindustan

Ques:- About your qualifications and expiriance
Ques:- David invested certain amount in three different schemes. A, B and C with the rate of interest 10% p.a., 12% p.a. and 15% p.a. respectively. If the total interest accrued in one year was Rs. 3200 and the amount invested in scheme C was 150% of the amount invested in scheme A and 240% of the amount invested in scheme B, what was the amount invested in scheme B?
Ques:- A person meets a train at a railway station coming daily at a particular time. One day he is late by 25 minutes, and he meets the train 5 k.m. before the station. If his speed is 12 kmph, what is the speed of the train.
Recent Answer : Added by DK BOSS On 2021-07-30 16:27:20:

Ans: 60 kph

Suppose Person meets the train everyday at 3 PM at Station A.

His speed is 12kph.

So normally he reaches 5 km before the meeting point (pt B) at (5/12 hr = 25 min before) 2:35PM.

But if he is late by 30 min, then he will reach that point (pt B) by 3:05 PM.

Train is traveling at its normal speed so it covers the distance of 5 Km in 5 min starting from Station A and reaches the meeting point (pt B) at 3:05 PM.

So speed of the train is 5KM/5min = 60 kph.

Ques:- For measuring 1- 40 kg how many different weight are needed?
Ques:- What kind of hobbies and interests do you possess?
Ques:- Find the smallest four-digit number which is a multiple of 112?
Recent Answer : Added by Admin On 2022-09-29 19:09:33:

Calculation:
⇒ If 1000 divided by 112, the remainder is 104. ⇒ 112 – 104 = 8 ⇒ If 8 is added to 1000 it will become the smallest four-digit number and a multiple of 112. ⇒ 1000 + 8 = 1008 ∴ The required result will be 1008.

Ques:- Is detail important to you? Do you think details should be left to your assistant?
Ques:- Two pipes X and Y can fill a cistern in 12 minutes and 15 minutes respectively while a third pipe Z can empty the full tank in 6 minutes. X and Y are kept open for 5 minutes in the beginning and then Z is also opened. In what time is the cistern emptied?
Ques:- Tell me about the experience?
Ques:- Find out the wrong number in the series:
19, 26, 33, 46, 59, 74, 91
A. 26
B. 33
C. 46
D. 59
Recent Answer : Added by Vignesh . O On 2022-10-07 17:19:38:

Answer 33
Adding 7,9.13,15,17
Correct is 35

Ques:- A sum of money deposited at C.I. amounts to Rs.2420 in 2 years and to Rs.2662 in 3 years. Find the rate percent?
Ques:- About the family and hobbies and ambitions
Ques:- My total life story
Ques:- Where U will charge Propane for make up during compressor unit running
Ques:- Do you have or know someone with pain?
Ques:- If you won the lottery, would you still work?
Ques:- If 12 men and 16 boys can do a piece of work in 5 days and 13 men together will 24 boys can do it in 4 days. Compare the daily work done by a man with that of a boy.
Recent Answer : Added by anit On 2021-10-08 16:31:40:

2:1

Ques:- How many times do the hands of a clock point towards each other in a day?
A. 12
B. 20
C. 22
D. 24
Recent Answer : Added by narendra On 2022-09-18 09:03:29:

22

Ques:- What approach do you take in getting your people to accept your ideas or department goals?
Ques:- Why do you want to to change the job
Ques:- Basics of our subjects in cse dept
Ques:- A and B started a partnership business investing some amount in the ratio of 3 : 5. C joined them after six months with an amount equal to that of B. In what proportion should the profit at the end of the one year be distributed among A, B and C?
A. 3 : 5 : 2
B. 3 : 5 : 5
C. 3 : 5 : 8
D. 6 : 10 : 5
Recent Answer : Added by yangqi On 2021-08-28 11:27:09:

D

Ques:- Before where did you worked?
Ques:- Joe is fencing in a square area of 576 square feet. Fence posts, which are needed every three feet, cost 32.00 each. The fencing cost 4.50 per foot. What is the total cost of the fencing materials?
Recent Answer : Added by Vivek Bharadwaj On 2022-08-14 16:33:40:

Joe is fencing in a square area of 576 square feet.
Fence posts, which are needed every three feet, cost 32.00 each.
The fencing cost 4.50 per foot. What is the total cost of the fencing materials?

Solution:-
Area of Square is 576 sq ft.
so, the length of side = root(576) = 24 ft

Since the fencing would be done on the perimeter, we would need that
formula is 4*side = 96 ft.

Number of Fence post needed = 96/3 = 32

1 Fence post cost = 32
32 Fence Post cost = 32 * 32 = 1024

Fencing cost = Perimeter * fencing cost = 96 * 4.5 = 432

Total Cost = 432 + 1024 = 1456

Contact with us regarding this list

Devendra Bhardwaj With a decade of experience as a Job Hiring Expert, I am a results-driven professional dedicated to elevating recruitment strategies. My expertise lies in navigating the dynamic landscape of talent acquisition, employing innovative approaches to attract, assess, and secure top-tier candidates. I excel in optimizing hiring processes, leveraging cutting-edge technologies, and fostering collaborative relationships with stakeholders. A keen understanding of industry trends allows me to stay ahead, ensuring a competitive edge in securing the best talent for your organization. I am passionate about connecting the right people with the right opportunities and thrive in creating impactful, streamlined recruitment solutions.

Scroll to top