( a ) 10 metres
The most important belief is belief in yourself. Believing in who you are and your abilities frees you to pursue goals and dreams without reservation and drives you forward with confidence, independence, autonomy and direction. Combine this conviction in yourself with a solid framework of inherent beliefs from the list above, and you have an unbeatable combination.
34
9/32
From the first statement
Speed=distance/time
=>240/24=10m/s
so speed=10m/s
From the second statement
distance=length of the platform+length of the train=650+240=890m
Time=distance/speed
here, the speed of the train is already calculated
=>890/10=89s
So the time taken by the train to cross the platform is 89 seconds
P+C+M=80
P+C=70
Therefore M=10
Given , P+M=90
If M=10
P=80
1200 meter
22
13
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
125, 106, 88, 76, 65, 58, 53
88
CORRECT ANS : B