- Great plains manufacturing, inc. General Aptitude Interview Questions
- Great plains manufacturing, inc. Trainee Interview Questions
- Great plains manufacturing, inc. Personal Questions round Interview Questions
- Great plains manufacturing, inc. HR Interview Questions
- Great plains manufacturing, inc. Lead Interview Questions
190, 166, 145, 128, 112, 100, 91
128 is incorrect. There is a difference of multiples of 3 in the number pattern, which starts at 24 and reduces by 3 each time. Therefore the correct pattern would read 190, 166, 145, 127, 112, 100, 91.
this would leave the pattern with differences in the pattern 24, 21, 18, 15, 12, 9. The next number in the pattern would be 6 lower than 91. 91 – 6 = 85. Then 85 -3 – 82, followed by 82 – 0 = 82. After this, if -3 were taken the pattern would start to rise so 82 – – 3 = 85.
d / (x+1/2) = 4/5 * t
and d / (x-1/2) = 5/2 + t
solving we get d = 15.
obey
A is travelling at 50kmph, B is travelling at 40
kmph……..according to the formula
time taken to meet = distance between them
———————-
relative speed of two vehicles
so, time taken to meet= 15/(50-40)=15/10=3/2hrs
3
Tuesday
D
Speed = 13+4 km/hr
Distance = 68 km/hr
Time=distance/speed
68/17=4hrs
MEDICINE will become EOJDJEFM in the same code.
Joe is fencing in a square area of 576 square feet.
Fence posts, which are needed every three feet, cost 32.00 each.
The fencing cost 4.50 per foot. What is the total cost of the fencing materials?
Solution:-
Area of Square is 576 sq ft.
so, the length of side = root(576) = 24 ft
Since the fencing would be done on the perimeter, we would need that
formula is 4*side = 96 ft.
Number of Fence post needed = 96/3 = 32
1 Fence post cost = 32
32 Fence Post cost = 32 * 32 = 1024
Fencing cost = Perimeter * fencing cost = 96 * 4.5 = 432
Total Cost = 432 + 1024 = 1456
13km
Hard work would mean spending long hours to complete my work without any shortcuts. It definitely ensures results but the process is long and stressful. Smart work would be aiming for the same results but with planning and prioritization of tasks.
let original radius=100
original surface area lets say it x =4 * (22/7) * 100 *100
new radius=100 + 50% of 100=150
new surface area lets say it y = 4 * (22/7)* 150* 150
increase in surface area=((y-x)/x) * 100
i.e.
((4*(22/7)*150*150 – 4*(22/7)*100 *100) / (4*(22/7)*100*100))*100
=125
so the answer is 125%.
hope this helps you.