Forte Research Systems Interview Questions, Process, and Tips

Ques:- Give me 5 strong & weak points of yours
Ques:- Side of rhombus is 5cm and sum of lengths of diagonals is 12cm. what is the area of rhombus?
Ques:- Why u want to join as a m.r?
Ques:- The average temperature was 37C for Monday to Wednesday and 34C for Tuesday to Thursday . If the temperature on Thursday was 4/5 th of that of Monday,what was the temperature on Thursday?
Recent Answer : Added by Jade On 2022-09-22 16:41:17:

First write equations from info:
(A) (Mon + Tue + Wed)/3 = 111 Rearrange as ——–> Tue + Wed = 111 – Mon
(B) (Tue + Wed + Thu)/3 =102 Rearrange as ——–> Tue + Wed = 102 – Thu
(C) Thu = 0.8(Mon)

Substitute equation C into B:
(B) Tue + Wed = 102 – 0.8(Mon)

At this point I changed the values for clearer algebra:
Mon = x
Tue + Wed = y

Re-write equations A & B with new values:
(A) y = 111 – x
(B) y = 102 – 0.8x

Solve simultaneous equations:

111 – x = 102 – 0.8x
111 – 102 = x – 0.8x (Re-arraged)
9 = 0.2x
x = 45

Thus, Mon = 45C

Thu = 0.8(45)
Thu = 36C

So the answer is it was 36C on Thursday

Ques:- How many numbers up to 100 are divisible by 7?
Recent Answer : Added by DK BOSS On 2021-07-30 16:27:11:

divide 100 by 7, and you get 14.28. (Obviously you aren’t talking about decimals here) and so 14 numbers can be divisible by 7 up to 100.

The answer is 14.

Ques:- How many seconds will a train 100 meters long take to cross a bridge 150 meters long if the speed of the train is 36 kmph?
Recent Answer : Added by Reshma patro On 2022-03-09 16:35:28:

35 km/h = 10 m/s
Speed = Distance/Time

Distance= (100+150)m = 250m
Speed = 10 m/s

Time= 250/10 = 25s

Ques:- What kind of writing have you done? For a group? For an individual?
Ques:- What are your strong and weak point ?
Ques:- How long would you stay with us?
Ques:- How much experience you have as quality control Engineer?
Ques:- How do you judge people?
Recent Answer : Added by Rahul On 2023-07-11 15:11:54:

By their Ability to suck dick.

Ques:- How often between 11 o’clock and 12 o’clock are the hands of a clock in integral number of minutes apart?
A. 54 times
B. 55 times
C. 56 times
D. 58 times
Recent Answer : Added by Laddagiri Naveen On 2022-03-09 16:34:59:

C

Ques:- How do you feel about working in extreme weather conditions all year round?
Ques:- Two persons A and B take a field on rent. A puts on it 21 horses for 3 months and 15 cows for 2 months; B puts 15 cows for 6months and 40 sheep for 7 1/2 months. If one day, 3 horses eat as much as 5 cows and 6 cows as much as 10 sheep, what part of the rent should A pay?
Recent Answer : Added by Subhrajyotii Guha On 2022-08-14 16:25:40:

1/3rd of it

Ques:- A train running at the speed of 60 km/hr crosses a pole in 9 seconds. What is the length of the train?
A. 120 metres
B. 150 metres
C. 180 metres
D. 200 metres
Recent Answer : Added by anonymous On 2022-03-09 16:37:58:

60*5/18*9=150

Ques:- How did you become interested in the position of cabin crew?
Ques:- Describe for me one or two of the biggest disappointments in your work history?
Ques:- Two pipes X and Y can separately fill a cistern in 18 and 24 hours respectively. If they are turned on alternately for one hour each, how long will it take to fill the cistern?
Recent Answer : Added by Admin On 2022-09-28 17:08:06:

X filling rate is 1/18 or 4/72 per hour

Y filling rate is 1/24 or 3/72 per hour

Combined as a pair it’s 7/72 in a complete 2 hour alternating sequence

72+ 7/72 =10 sequences = 70/72 on 20 hours, The outstanding balance is just 2/72

So at 20.5 hours with X turn filling is 100% complete with 72/72

Answer: It will take 20.5 hours to completely fill this tank.

Analysis of measured filling process, from X = 42/72 share & from Y = 30/72 share

Ques:- How would you manage two projects that require your time?
Ques:- A man took loan from a bank at the rate of 12% p.a. S.I. After 3 years he had to pay Rs. 5400 interest only for the period. The principal amount borrowed by him was?
Recent Answer : Added by ASIF ASLAM On 2022-08-14 16:46:32:

3800

Ques:- Why would you like to join us?
Ques:- Lets say you have being given work to collect data from all department heads and make a report presentation by Wednesday and present that report to your boss in the board meeting on Thursday, “How will you do that” say if 1 or 2 department heads don’t give you data, how will you convince them to give data?
Ques:- A started at 9.00 am with 6 mph and B started at 9.30 am with 8mph in the same direction. At what time they will meet?
Recent Answer : Added by DK BOSS On 2021-07-16 09:52:53:

A’s speed=6 mph ,B’s speed=8 mph
Let, after x hrs, they will meet.
so, the distance traveled by A in x hrs should be the same as the distance traveled by B in (x-1/2)hrs [as B started the journey after 30 min of A]
Thus, 6x=8(x-1/2)[as distance=speed*time]
=>8x-6x=4
=>2x=4
=>x=2
after 2 hrs they will meet so time=(9+2)=11.00 a.m

Ques:- Eight persons – P, Q, R, S, T, U, V and W are sitting around a circular table. S is to the immediate right of W. V is not next to either R or T. W is to the immediate right of T, who is sitting opposite to R. U and W are sitting opposite to each other. If R and V interchange their places, then who is opposite T?
Ques:- The LCM of 148 and 185 is
A. 3700
B. 2960
C. 740
D. 680
Recent Answer : Added by R.Geethanjali On 2022-04-02 06:59:22:

740

Ques:- Evaluate 2758 + 20581 – 17889 = ?
Ques:- How can you deal with Customer?
Ques:- Reena took a loan of Rs. 1200 with simple interest for as many years as the rate of interest. If she paid Rs. 432 as interest at the end of the loan period, what was the rate of interest?
Ques:- How to handle in critical position?
Ques:- Do you think that technology can help to achieve better efficiency at work? And can you give me an example to explain your thinking?
Recent Answer : Added by Pradip kunar On 2021-11-09 15:53:37:

Yes, technology give me better efficiency to my work. Just we have take a work piece of sheet metal to convert in product like is box, different size, where manually it’s complete on 3 to 4 days but with the help of technology I have done in 3 hours that’s I said the technology give better efficiency to my better work.

Contact with us regarding this list

Devendra Bhardwaj With a decade of experience as a Job Hiring Expert, I am a results-driven professional dedicated to elevating recruitment strategies. My expertise lies in navigating the dynamic landscape of talent acquisition, employing innovative approaches to attract, assess, and secure top-tier candidates. I excel in optimizing hiring processes, leveraging cutting-edge technologies, and fostering collaborative relationships with stakeholders. A keen understanding of industry trends allows me to stay ahead, ensuring a competitive edge in securing the best talent for your organization. I am passionate about connecting the right people with the right opportunities and thrive in creating impactful, streamlined recruitment solutions.

Scroll to top