petticoat
both a and b is correct
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
it was a friday.
Tree
Father’s sister
Answer: Option C two
p = prob(1st digit not 7)*prob(2nd digit not 7)*prob(3rd
digit not 7)
=(8/9)*(9/10)*(9/10)
=0.72
Sandhya had it right except that there are 900 numbers
between 100 and 999 inclusive (not 899).
15 min 100 line
30 min 200 lines + 15 min rest total 45 min +5 min think +5 min write + 5 min rest
250 line code will be done
How will you know the odd is in lighter one or heavier one from only one weighing. It will require 2 weighing to find the odd set and one weighing for odd coin in that set i.e total 3 weighings.
c
P+R=200
Q+R=350
+
—————-
P+Q+2R=550
P+Q+R=500
–
____________
R=50
No of men employed = N
No of days to finish the work = 9 days
No of men after increase = (N + 10)
No of days to finish the work = 6 days
Equating mandays
9N = (N+10)*6
9N — 6N = 60
3N = 60
N = 20
No of men employed = 20
15/46=0.32