860
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
Complete step-by-step answer:
Investment made by A for 1 year, IA=2000
Investment made by B for 2 year,
IB=2×3000IB=6000
Investment made by C for 2 year,
IC=2×4000IC=8000
The ratio of their investment is given by
IA:IB:IC=2000:6000:8000
To simplify the ratio divide it by 1000,
IA:IB:IC=2:6:8
Now again to simplify divide the ratio by 2,
IA:IB:IC=1:3:4
The total parts of this investment =1+3+4=8
A’s share in the investment is 1 out of the 8 parts; B’s share is 3 out of 8 while C’s share is 4.
Therefore, the profit share of A’s investment of Rs. 2000=18×3200=400.
2.88
Total game played= 60
%won =30%
Total won= 60*30/100 i.e. 18
now team plays x games and win all of those to increase the
average to 50%.
So,
(60+x)*50/100=18+x
(60+x)/2=18+x
60+x=36+2x
24=x
So the final answer is 24.
“Since I’ve been working and gaining experience to get into this company, I’d like to stay a long time if I’m offered the job, since this is where I want to be. “ “As long as there’s a lot of work to do, then I’d be happy to stay for a long time. Since I’m a busybody, I like to being productive most of the time.”
2hr 24min
7
w, l=2w , area of square =8^2 = 64
area of rectangle = l*b
so w*2w = 8*64
w=16
length = 32
p = prob(1st digit not 7)*prob(2nd digit not 7)*prob(3rd
digit not 7)
=(8/9)*(9/10)*(9/10)
=0.72
Sandhya had it right except that there are 900 numbers
between 100 and 999 inclusive (not 899).
14
Hard work would mean spending long hours to complete my work without any shortcuts. It definitely ensures results but the process is long and stressful. Smart work would be aiming for the same results but with planning and prioritization of tasks.
A = (B*H)/2
H = 2B
formula becomes A = (B*2*B)/2
this can be rewritten as A = (2*B^2)/2
the 2 in the numerator and denominator cancel out and you get:
A = B^2
list price – actual price markrd by the company
net price (average price of all items inclusive all discounts,breakage & so on.) which is 425 i.e. 50% of the marked price
hence the list price or marked price is twice the net sale price = 850
50%=425
100%=?
=100%*425/50=850
3600