Cake is never cut in such a way.
Wat we can do is.
1st cut should be cutting the Cake into two Halfs
Now put one half on top of other. Then again cutting it like
we made the 1st cut.
so now 4 parts. Two on top two on below.
Now Cut the cake in the orthogonal direction than the
earlier two cuts.
The trick was only That u can put one half on top of other.
Tats it.
let the total work to be done =1
so a+b+c=1 (say)
then a and b are supposed to do 7/11 th of work
so c= 1- (7/11)
c=4/11
therefore c gets (4/11)*550
=200 is the answer
9000
(115+65+x)/3=95
x=105
let original radius=100
original surface area lets say it x =4 * (22/7) * 100 *100
new radius=100 + 50% of 100=150
new surface area lets say it y = 4 * (22/7)* 150* 150
increase in surface area=((y-x)/x) * 100
i.e.
((4*(22/7)*150*150 – 4*(22/7)*100 *100) / (4*(22/7)*100*100))*100
=125
so the answer is 125%.
hope this helps you.
a printer produced 176400 lines in 420 minutes
it produces 176400/420 lines per minute = 420
answer is : 420 lines per minutes
– While the train is moving, the jogger will also be running in the same direction.
– for the head(engine) of the train to get to the current position of the jogger 240m away, it will take:
45km/hr => 12.5m/s => 240/12.5 = 19.2 seconds.
– But in the same period of time, the jogger will still be running and will have moved to a new location by: 9km/hr => 2.5m/s => 2.5 * 19.2 = 48m
To get to the new location at the speed of 12.5m/s will take the train:
48/12.5 = 3.84sec
In this additional time, the jogger will move forward by:
3.84 * 2.5 = 9.6m
at a speed of 12.5m/s, it will take the train less than a second to cover the additional 9.6m
If we add the distance the jogger will cover in 1 second to 9.6, it is still less than what the train can cover per second. let us see (9.6 + 2.5 = 12.1)
Therefore, the head of the train will pass the runner at approximately: 19.2 + 3.84 + 1 => 24.04 seconds.
For the train to completely pass the runner, it will need its whole length of 120m to be in front of the runner.
This will take an additional (9.6 + 2) seconds.
Therefore for the length of the train to be ahead of the runner it will take approx. 35.65 (24.04 + 9.6 + 2) seconds
Kerala
b