V is sitting opposite to s
obvious
e^(i*pi) + 1 = 0
group wise work is use full and effectively
b
3hour 45 min = 13500 sec
In 1 sec he covers = 12 m
In 13500 sec he covers = 12×13500 m = (12×13500)/1000 km = 162 km
Ans : 162 km
190 sec
b
Let us consider previous salary as a ‘X’ then
0.12*X=0.10*(X+1200)
0.02X=120
X=120/.02=6000
X=6000
His previous salaray was 6000
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
1.6
.
let the total work to be done =1
so a+b+c=1 (say)
then a and b are supposed to do 7/11 th of work
so c= 1- (7/11)
c=4/11
therefore c gets (4/11)*550
=200 is the answer
Put a= 4, b = 2 in the equation and multiplying by 2/2 then you will get same value in right hand side. It mean a is 2a which mean b<a
I think speed of printing per minute has nothing do to with how long printer being at work.
If “given day” = 8 hours.
8h = 480m
x = 176400 / 480 = 367.5 lines per minute.
x and y can be equal to 1..
If so,then he gets 1/1 of Rs.10 which is equal to 10 and
again 1/1 of Rs.10=Rs.10..so,he gets total of 20..and
returns 20..so,no gain and no loss..
If x=1,y=2,he gets, 5+20=25..and returns 20..so he may not
lose..
So,whatever be the values of x and y,only these two answers
are possible..
so its a)He never loses..