Cbe solutions Interview Questions, Process, and Tips

Ques:- A man gets x/y of Rs.10 and y/x of Rs.10. He returns Rs.20. The Answer choices are a) He may not lose b) He may lose c) He always loses d) Cannot be Determined
Recent Answer : Added by Admin On 2020-05-17 12:02:08:

x and y can be equal to 1..
If so,then he gets 1/1 of Rs.10 which is equal to 10 and
again 1/1 of Rs.10=Rs.10..so,he gets total of 20..and
returns 20..so,no gain and no loss..
If x=1,y=2,he gets, 5+20=25..and returns 20..so he may not
lose..
So,whatever be the values of x and y,only these two answers
are possible..
so its a)He never loses..

Ques:- What is the height of room if after entering the room with a watch your head strikes a hanging bulb?
Ques:- Tell me something negative you?ve heard about our company?
Ques:- Eight persons – P, Q, R, S, T, U, V and W are sitting around a circular table. S is to the immediate right of W. V is not next to either R or T. W is to the immediate right of T, who is sitting opposite to R. U and W are sitting opposite to each other. Who is sitting opposite to S?
Recent Answer : Added by Dolly chawla On 2021-10-19 16:10:29:

V is sitting opposite to s

Ques:- In your opinion, what is the most beautiful math equation ever derived?
Recent Answer : Added by Admin On 2020-05-17 12:01:49:

obvious
e^(i*pi) + 1 = 0

Ques:- Do you feel you work more effectively on a one to one basis or in a group situation?
Recent Answer : Added by RITESH KATARWAR On 2021-11-18 17:15:58:

group wise work is use full and effectively

Ques:- What is Goal.
Ques:- Examination passed from and either training was done or not?
Ques:- ?SAFMA? is associated with?
Ques:- The length and breadth of of a rectangle is in the ratio 7:5. If the length decreases by 5 and the breadth increases by 2, then the area of it was 65 sq-km. Find the actual length and breath of the rectangle.
Ques:- The HCF of two numbers is 11 and their LCM is 7700. If one of these numbers is 275, then the other one is
A. 918
B. 308
C. 283
D. 279
Recent Answer : Added by narendra On 2022-09-18 09:03:28:

b

Ques:- If 12 men shakes hand from each other then what will be the total no. of hand shakes exchanged.?
Ques:- If a man can cover 12 metres in one second, how many kilometres can he cover in 3 hours 45 minutes?
Recent Answer : Added by Sohini Mitra On 2022-09-02 17:02:39:

3hour 45 min = 13500 sec
In 1 sec he covers = 12 m
In 13500 sec he covers = 12×13500 m = (12×13500)/1000 km = 162 km

Ans : 162 km

Ques:- A 1200 m long train crosses a tree in 120 sec, how much time will I take to pass a platform 700 m long?
Recent Answer : Added by Sakshi On 2022-01-16 17:20:06:

190 sec

Ques:- The smallest prime number, that is the fifth term of an increasing arithmetic sequence in which all the four preceding terms are also prime is
A. 17
B. 29
C. 37
D. 53
Recent Answer : Added by narendra On 2022-09-18 09:02:32:

b

Ques:- A MAN’S SALARY IS INCREASED BY 1200 ,TAX IS DECREASED FROM 12% TO 10% BUT HE PAYS SAME AMOUNT AS TAX . WHAT IS THE PREVISIOUS SALARY?
Recent Answer : Added by Admin On 2020-05-17 12:04:31:

Let us consider previous salary as a ‘X’ then
0.12*X=0.10*(X+1200)
0.02X=120
X=120/.02=6000
X=6000
His previous salaray was 6000

Ques:- A,B and C needs 8, 12 and 16 days respectively to finish a task. How many days will it take if A works for 2 days then B works on it until 25% of the job is left for C to do, and C completes the work?
Recent Answer : Added by Deven Sharma On 2023-05-31 18:36:37:

To solve this problem, we can break it down into steps:

Step 1: Determine the individual rates of work for A, B, and C.

If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.

Step 2: Calculate the combined work rate of A and B.

If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.

Step 3: Calculate the time it takes for B to complete 75% of the task.

Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.

Step 4: Calculate the remaining work for C.

If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.

Step 5: Calculate the time it takes for C to complete the remaining work.

Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.

Step 6: Calculate the total time required.

A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.

Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.

Ques:- How many litres of pure acid are there in 8 litres of a 20% solution?
A. 1.4
B. 1.5
C. 1.6
D. 2.4
Recent Answer : Added by Kasoja Shiva On 2022-03-09 16:26:30:

1.6

Ques:- My job profile
Ques:- Can you describe how you solved a work or school problem?
Ques:- Tell me something about you, your qualification.
Ques:- What steps do you take to establish a rapport with others?
Ques:- 1.14 expressed as a percent of 1.9 is
A. 6%
B. 10%
C. 60%
D. 90%
Recent Answer : Added by Varshitha On 2022-06-20 11:28:59:

.

Ques:- A, B and C contract a work for Rs. 550. Together A and B aresupposed to do 7/11th of the work. How much does C get?
Recent Answer : Added by Admin On 2020-05-17 12:03:59:

let the total work to be done =1
so a+b+c=1 (say)
then a and b are supposed to do 7/11 th of work
so c= 1- (7/11)
c=4/11
therefore c gets (4/11)*550
=200 is the answer

Ques:- How would you plan a vacation ?
Ques:- If the annual rate of simple interest increases from 10% to 12.5%, a man’s yearly income increases by Rs. 1250. His principal in Rs. is?
Ques:- If a and b are positive integers and (a-b)/3.5 = 4/7, then (A) b < a(B) b > a(C) b = a(D) b >= a
Recent Answer : Added by Mustafa On 2022-08-14 16:31:58:

Put a= 4, b = 2 in the equation and multiplying by 2/2 then you will get same value in right hand side. It mean a is 2a which mean b<a

Ques:- Name one new/unique initiative of yours at your current organization
Ques:- How long would it take you to make a meaningfulcontribution to our firm?
Ques:- A computer printer produces 176400 lines in a given day. If the printer is in operation for 7 hrs during the day how many lines did it print per minute?
Recent Answer : Added by Alex On 2022-04-02 06:58:03:

I think speed of printing per minute has nothing do to with how long printer being at work.

If “given day” = 8 hours.
8h = 480m

x = 176400 / 480 = 367.5 lines per minute.

Contact with us regarding this list

Devendra Bhardwaj With a decade of experience as a Job Hiring Expert, I am a results-driven professional dedicated to elevating recruitment strategies. My expertise lies in navigating the dynamic landscape of talent acquisition, employing innovative approaches to attract, assess, and secure top-tier candidates. I excel in optimizing hiring processes, leveraging cutting-edge technologies, and fostering collaborative relationships with stakeholders. A keen understanding of industry trends allows me to stay ahead, ensuring a competitive edge in securing the best talent for your organization. I am passionate about connecting the right people with the right opportunities and thrive in creating impactful, streamlined recruitment solutions.

Scroll to top