- Canterbury christ church university General Aptitude Interview Questions
- Canterbury christ church university Trainee Interview Questions
- Canterbury christ church university Personal Questions round Interview Questions
- Canterbury christ church university HR Interview Questions
- Canterbury christ church university Lead Interview Questions
c
Answer: 40
Explanation:
800*(25/100) = 200 —- 5
? —- 1 => Rs.40
3;4
Creating a virtual image of the search topic
⇒ First part = Rs. 828
pass English =80%
fail=100-80=20%
pass Math = 70%
fail in Math=100-70=30%
fail in both=10%
total fail students= fail in Eng+fail in Math-common
= 20+30-10=40%
if 40% fail then 60% will pass
let total students=x
hence
60% 0f (total students)=144
60/100 of (x)= 144
x=(144×100)/60
X=240
total students=240
brother and sister
(3)^ 7.5 ÷ (27)^1.5 x (9)^2 = 3?
⇒(3)^7.5 ÷ {(3)^(3 x 1.5)} x {(3)^(2 x 2)} = 3 ?
⇒ 3^(7.5 – 4.5 + 4) = 3?
⇒ 3^7 = 3?
⇒ ? = 7
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
Ans. 175
Relative speed in m/s=40-22=18X5/18=5m/s
Total distance=125+x m
T=1min=60 s
D=sXt
125+x=5X60
x=175
he removed one bolt in each three wheels
and fixed the bolts in stephiny wheel