- Bishop grosseteste university General Aptitude Interview Questions
- Bishop grosseteste university Trainee Interview Questions
- Bishop grosseteste university Personal Questions round Interview Questions
- Bishop grosseteste university HR Interview Questions
- Bishop grosseteste university Lead Interview Questions
2880, 480, 92, 24, 8, 4, 4
1, 8, 27, 64, 124, 216, 343
Answer is 124 because in this series is cube root sequence 2 cube root is 8 ,3 cube root is 24,4 cube root is 64, 5 cube root is 125 but there is 124 which is wrong ,6 cube root is 216 ,7 cube root is 343 .
The formula to find number of diagonals (D) given total number of vertices or sides (N) is
N * (N – 3)
D = ———–
2
Using the formula, we get
1325 * 2 = N * (N – 3)
N2 – 3N – 2650 = 0
Solving the quadratic equation, we get N = 53 or -50
It is obvious that answer is 53 as number of vertices can not be negative.
Alternatively, you can derive the formula as triange has 0 diagonals, quadrangel has 2, pentagon has 5, hexagon has 9 and so on……
Hence the series is 0, 0, 0, 2, 5, 9, 14, …….. (as diagram with 1,2 or 3 vertices will have 0 diagonals).
Using the series one can arrive to the formula given above.
B. 70%
d
I have seen a few say 25% as an answer to this. But looks
like their math isn’t good and is extremeley complex to
have an asnwer of 25% to this question. Consider – Rs.1.00/-
per mango; so 40 mangoes = Rs.40.00/-, implies Rs.4.00/-
extra at the end of the deal. So he’s left with Rs.44.00/-
after selling 40 mangoes implies a profit of Rs.4.00/- over
Rs.40.00 = 44/40 = 110% which means his profit is 10%.
Hope this helps…
Thanks.
The answer is A)
y1 = 62 Rs/kg
y2 = 72 Rs/kg
y = 64.5 Rs/kg
y2 – y1 = 10 Rs/kg
The distance between the y and y1 is
y – y1 = 64.5 – 62 = 2.5
x1 = (y – y1)/(y2 – y1) = 2.5/10 = 0.25
x2 = 1 – x1 = 1 – 0.25 = 0.75
The target price is calculated by the lever method.
x1 * y2 + x2 * y1 = 0.25 * 72 + 0.75 * 62.5 = 64.5
The ratio is of y1 to y2 is
0.75 : 0.25
Divide by both by 0.25
3 : 1
My definition of success is being able to complete the task given to me in the provided timeline
0.000256
5436
C
4×1 = 4
4×2=8
8×3=24
24×4= 96 (not 92)
96×5 =480
480×6= 2880
So answer is 92