Arihant Industrial Interview Questions, Process, and Tips

Ques:- 7589 ? ? = 3434
A. 3721
B. 4155
C. 3246
D. 11023
E. None of these
Recent Answer : Added by Indupriya On 2022-05-17 09:06:46:

4155

Ques:- If 5/2 artists make 5/2 paintings using 5/2 canvases in 5/2 days then how many artists r required to make 25 paintings using 25 canvases in 25 days?
Ques:- A light bulb is hanging in a room. Outside of the room there are three switches, of which only one is connected to the lamp. In the starting situation, all switches are 'off' and the bulb is not lit. If it is allowed to check in the room only once.How would you know which is the switch?
Recent Answer : Added by Mukesh On 2022-08-14 18:02:46:

Put switch 1 on and leave it on for 2 minutes, then switch it off.
Put switch 2 on and leave it on, then walk into the room.
If the light is on, the answer is switch 2.
If the light is off but the bulb is warm when you feel it, the answer is switch 1.
If the light is off and the bulb is cold when you feel it, the answer is switch 3.

Ques:- If X, Y and Z together can finish a piece of work in 4 days. X alone in 12 days and Y in 18 days, then Z alone can do it in?
Recent Answer : Added by satya On 2021-08-23 11:42:44:

9 days

Ques:- Please brief us about ur self?
Ques:- Why I didn’t chose for the placement offer I received from my campus
Ques:- Do you apply for another job?
Ques:- How do you deal with stress?
Ques:- City A's population is 68000, decreasing at a rate of 80 people per year. City B having population 42000 is increasing at a rate of 120 people per year. In how many years both the cities will have same population?
Recent Answer : Added by Satya On 2021-05-28 08:49:36:

At 130 years.

Ques:- Some gatekeepers are warriors and some warriors are cowards therefore some gatekeepers must be cowards.What is correct answer?
Recent Answer : Added by Mirgank On 2022-05-17 08:56:48:

True

Ques:- Thirty men take 20 days to complete a job working 9 hours a day. How many hour a day should 40 men work to complete the job?
A. 8 hrs
B. 7 1/2 hrs
C. 7 hrs
D. 9 hrs
Recent Answer : Added by 9074743593 On 2021-07-29 16:19:42:

7 1/2

Ques:- Current General Knowledge
Ques:- How many figures are required for numbering the pages of a book containing 1000 pages?
Recent Answer : Added by MG On 2022-03-09 16:28:41:

pages # figures
1000 1000 4
from 999 to 100 (999-99)*3 2700
from 99 to 10 (99-9)*2 180
from 9 to 1 (9-0)*1 9
total sum= 2893

Ques:- Assume that passwords are selected from four-character combinations of 26 alphabetic characters. Assume that an adversary is able to attempt passwords at a rate of one persecond.a) Assuming no feedback to the adversary until each attempt has been completed, what is the expected time to discover the correct password?
Ques:- The average temperature was 37C for Monday to Wednesday and 34C for Tuesday to Thursday . If the temperature on Thursday was 4/5 th of that of Monday,what was the temperature on Thursday?
Recent Answer : Added by Jade On 2022-09-22 16:41:17:

First write equations from info:
(A) (Mon + Tue + Wed)/3 = 111 Rearrange as ——–> Tue + Wed = 111 – Mon
(B) (Tue + Wed + Thu)/3 =102 Rearrange as ——–> Tue + Wed = 102 – Thu
(C) Thu = 0.8(Mon)

Substitute equation C into B:
(B) Tue + Wed = 102 – 0.8(Mon)

At this point I changed the values for clearer algebra:
Mon = x
Tue + Wed = y

Re-write equations A & B with new values:
(A) y = 111 – x
(B) y = 102 – 0.8x

Solve simultaneous equations:

111 – x = 102 – 0.8x
111 – 102 = x – 0.8x (Re-arraged)
9 = 0.2x
x = 45

Thus, Mon = 45C

Thu = 0.8(45)
Thu = 36C

So the answer is it was 36C on Thursday

Ques:- Tell me something negative you?ve heard about our company?
Ques:- One pipe can fill a tank three times as fast as another pipe. If together the two pipes can fill tank in 36 min, then the slower pipe alone will be able to fill the tank in?
Recent Answer : Added by Thrinayani sanagapati On 2022-08-14 16:28:52:

1/x+1/3x=1/36
4/3x=1/36
36*4=3x
X=48
So the slower pipe alone fill the tank in 48 minutes.

Ques:- I completed side course from PGDCA, SISI institute in saidapet
Ques:- Will you able to work on sites?
Ques:- The PSLV-C12 was successfully launched into space from t h e Satish Dhawan Space Centre at Sriharikota on 28 April, 2009. PSLV stands for?
Ques:- If a 12 shell cupboard requires 18 ft of wall space then how much wall space would a 30 cup shelf require?
Ques:- Excluding stoppages, the speed of a train is 45 kmph and including stoppages it is 36 kmph. Of how many minutes does the train stop per hour?
Ques:- How do you get on with different kinds of people?
Ques:- Do you have experience in medical billing?
Ques:- If the diagonals of a rhombus are 8 cm and 10 cm respectively what will be the area of the rhombus?
A. 35 sq cm
B. 40 sq cm
C. 30 sq cm
D. 20 sq cm
E. None of these
Recent Answer : Added by Admin On 2020-05-17 12:03:58:

( b ) 40 sq cm

Ques:- A contribution of Rs. 500 was raised from 500 people. The fee was as follows: Men: Rs.3.00 each Women: Rs. 2.00 each Children: 0.48 each. If number of women is more than number of men, how many children are there?
Ques:- You are given 8 identical balls …. but one of them is slightly heavier than the rest…. given a old scale (not electronic one) and only two trials to weigh … can u spot the odd one out????
Ques:- Find out the wrong number in the series:
3, 4, 9, 22.5, 67.5, 202.5, 810
A. 4
B. 9
C. 67.5
D. 202.5
Recent Answer : Added by Admin On 2022-09-23 19:13:36:

A. 4

Ques:- A train of 24 carriages, each of 60 meters length, when an engine also of 60 meters length is running at a speed of 60 kmph. In what time will the train cross a bridge 1.5 km long?
Recent Answer : Added by Raj On 2022-01-08 16:05:26:

3 min

Ques:- Why do you want to be an HR in initial stage of your career?

Contact with us regarding this list

Devendra Bhardwaj With a decade of experience as a Job Hiring Expert, I am a results-driven professional dedicated to elevating recruitment strategies. My expertise lies in navigating the dynamic landscape of talent acquisition, employing innovative approaches to attract, assess, and secure top-tier candidates. I excel in optimizing hiring processes, leveraging cutting-edge technologies, and fostering collaborative relationships with stakeholders. A keen understanding of industry trends allows me to stay ahead, ensuring a competitive edge in securing the best talent for your organization. I am passionate about connecting the right people with the right opportunities and thrive in creating impactful, streamlined recruitment solutions.

Scroll to top