Let numbers be 2x, 3x
Given: (2x)^3 + (3x)^3 = 945
8x^3 + 27x^3 = 945
x = 3
Difference between numbers = 3x – 2x = x
Hence difference = 3
1/x=1/5+1/10+1/30=lcm is 30.
->30/5=6
->30/10=3
->30/30=1
1/x=6+3+1=10
1/x=10/30=1/3=x=3
Ans is 3 hr.
2637
4815
OR
2817
4635
Soldier have to move 0.75 miles to West and then 0.375 miles to South to reach the camp.
How:-
Firstly soldier moving 1 mile to East from camp and then 1/2 miles= 0.50 miles to North .
Then it is moving 1/4 miles =0.25 miles to west
And then 1/8 miles =0.125 miles to South
Now we just have to count the difference and minus the value of camp to East with the value of North to west = 1mile – 0.25miles(1/4) = 0.75 miles
Same case with north and south = 0.50 miles(1/2) – 0.125 miles(1/8) = 0.375 miles
Hence proves to return camp the soldier have to move 0.75 miles to west and 0.375 miles to south
6*6=36 medals
6 days
1st day=1+35/7=6 remaining 30 medals
2nd day=2+28/7=6 remaining 24 medals
3rd day=3+21/7=6 remaining 18 medals
…
6th day 6 medals
540 meters or 0.54 km
Pen can’t be sharpened by sharpener
Pencil is only sharpened by sharpner
Likewise rigth man can only fill the rigth position so we have to select it. This is human resource recruiting.
In school teachers manage and motivate you to do your work.
The same is done to employees this is hrms
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
In the example first we have to find the area of the field
we have given the following values ,
cost of fencing per meter = Rs 1.50
Diameter of circular field = 28
We have to find the area , a = ?
We know that,
Area = 2 π r
= 2 x 22/7 x 14
= 2 x 22 x 2
= 44 x 2
= 88 sq. m
So, area of circle is 88 sq.m
Now just multiply it with 1.50
cost of fencing = 88 x 1.50
= Rs. 132
So, the cost of fencing the circular field is Rs. 132
1.26
48,400
28
to arrange m objects in n places => nCm
i.e. for this example m=2(+,- sign) and n = 8(places between two number from 1 to 9)
SO, answer is : 8C2 = (8*7) / 2 = 28
5 * 6 * 7 = 210 ,
Two Least No’s are 5,6
There fore 5+6=11 is answer
4 years
1 ball – 4 runs (1st batter – 94+4=98)
2 ball – 3 runs and one run is short run during running between the wicket (1st batter- 98+3-1 =100)and strike changes for 2nd batter
3 ball – 6 runs ( 2nd batter 94+6=100)
12