9 and 16
1min = 60 seconds
6 min=6*60=360seconds
4 sec=10
360sec=360*10 /4=900
these r all factors of 30
1*30=30
2*15=30
3*10=30
5*6=30
like that
Soldier have to move 0.75 miles to West and then 0.375 miles to South to reach the camp.
How:-
Firstly soldier moving 1 mile to East from camp and then 1/2 miles= 0.50 miles to North .
Then it is moving 1/4 miles =0.25 miles to west
And then 1/8 miles =0.125 miles to South
Now we just have to count the difference and minus the value of camp to East with the value of North to west = 1mile – 0.25miles(1/4) = 0.75 miles
Same case with north and south = 0.50 miles(1/2) – 0.125 miles(1/8) = 0.375 miles
Hence proves to return camp the soldier have to move 0.75 miles to west and 0.375 miles to south
55
Hog
Total inversement =20000
Arun and vinay =40% ,40%
Kamal =20%
8 month gain = 4005
Arun and vinay share of 6 months=1201.5
Kamal share of 6 month = 600.75
Now Arun left, then remaining 2 month’s profits =1001.25
In this case kamal have 33.3% and vinay have remaining percentage of 1001.25
33.3% of 1001.25 is 333.4
Now, total share of kamal is 600.75+333.4=934.16
6, 12, 48, 100, 384, 768, 3072
B. 100
G.c.d=num1 *num2/lcm
Num1=20
Gcd=5
Lcm=60
5=(20*num2)/60
Num2= 5*60/20
Num2=15
R
T,P,R,Q,S
A perfect square is a square number of a digit. eg 64 is a perfect number, a square of 8
Now digits AB9 is a square number of a number.
AB9 Can also be written as A multiply by B multiply by 9
Get the Square root of AB9
Assumption, A=1, B=1
1*1=1=A, 1*1=1=B Therefore,
Square root of A = A, B = B and 9=3
Therefore
An odd number is a number indivisible by 2.
for example 1,3,5,7…….
Therefore Squares A*B*9= AB9
Where a=1, b=1, 3 as digits.
Conclusion
A=1 is an odd number
600
200/3
Joe is fencing in a square area of 576 square feet.
Fence posts, which are needed every three feet, cost 32.00 each.
The fencing cost 4.50 per foot. What is the total cost of the fencing materials?
Solution:-
Area of Square is 576 sq ft.
so, the length of side = root(576) = 24 ft
Since the fencing would be done on the perimeter, we would need that
formula is 4*side = 96 ft.
Number of Fence post needed = 96/3 = 32
1 Fence post cost = 32
32 Fence Post cost = 32 * 32 = 1024
Fencing cost = Perimeter * fencing cost = 96 * 4.5 = 432
Total Cost = 432 + 1024 = 1456
x+8y=20, x=-3y
(-3y)+8y=20
5y=20
y=4
The answer for y is 4