- Federal reserve bank of minneapolis General Aptitude Interview Questions
- Federal reserve bank of minneapolis Trainee Interview Questions
- Federal reserve bank of minneapolis Personal Questions round Interview Questions
- Federal reserve bank of minneapolis HR Interview Questions
- Federal reserve bank of minneapolis Lead Interview Questions
To determine how many consecutive zeros the product of S will end with, we need to find the highest power of 10 that divides the product. This is equivalent to finding the highest power of 5 that divides the product, since the number of factors of 2 will always be greater than the number of factors of 5.
The primes in S are {2, 3, 5, 7, 11, 13, 17, 19, 23, 29, 31, 37, 41, 43, 47, 53, 59, 61, 67, 71, 73, 79, 83, 89, 97}.
There are 24 primes in S, so the product of S is:
2 x 3 x 5 x 7 x 11 x 13 x 17 x 19 x 23 x 29 x 31 x 37 x 41 x 43 x 47 x 53 x 59 x 61 x 67 x 71 x 73 x 79 x 83 x 89 x 97
We need to find the highest power of 5 that divides this product. To do this, we count the number of factors of 5 in the prime factorization of each number in S.
5 appears once: 5
5 appears once: 25
5 appears once: 35
5 appears once: 55
5 appears once: 65
5 appears once: 85
So, there are six factors of 5 in the product of S. However, we also need to consider the powers of 5 that arise from the factors 25, 35, 55, and 65.
25 = 5 x 5 appears once: 25
35 = 5 x 7 appears once: 35
55 = 5 x 11 appears once: 55
65 = 5 x 13 appears once: 65
Each of these numbers contributes an additional factor of 5 to the product of S. Therefore, there are 6 + 4 = 10 factors of 5 in the product of S.
Since each factor of 5 corresponds to a factor of 10, we know that the product of S will end with 10 zeros. Therefore, the product of S will end with 10 consecutive zeros
How breadth is 19.84..?
Apply Pythagoras therom,
a^2+b^2=c^2,
Lets Assume
c is hypotenuse or diagonal,
a is length or opposite side,
b is breadth or adjacent side,
Then,
256+b^2=400
b^2=144
b=12,
So the breadth is 12 cm
East
One day work = 1 / 20
One mans one day work = 1 / ( 20 * 75)
Now:
No. Of workers = 50
One day work = 50 * 1 / ( 20 * 75)
The total no. of days required to complete the work = (75 * 20) / 50 =
30
I think speed of printing per minute has nothing do to with how long printer being at work.
If “given day” = 8 hours.
8h = 480m
x = 176400 / 480 = 367.5 lines per minute.
c
A = (B*H)/2
H = 2B
formula becomes A = (B*2*B)/2
this can be rewritten as A = (2*B^2)/2
the 2 in the numerator and denominator cancel out and you get:
A = B^2
B will use 8days to work
cannot be determined .
114
I agree with @TUMWINE PETER