24 Kmp/h
B.25
under pressure a person more effort to his work
385, 462, 572, 396, 427, 671, 264
427 is the answer
Because
385 means (3+5=8) or (8-3=5) ,
462 means (4+2=6) or (6-2=4) ,
572 means (5+2=7) or (7-5=2) ,
396 means (6+3=9) or (9-3=6) ,
671 means (6+1=7) or (7-6=1) ,
264 means (4+2=6) or (6-2=4) ,
but only 427 is the number in which if we do addition of any of its two digits (e.g 4+2 or 4+7) then its answer doesn’t come 3rd digit
like if we do 4+2 then answer will be 6 so the number should be 426 but it is not
or if we do 7-4 then answer will be 3 (not 2)
so the right answer is 427
Let Suvarna, Tara, Uma and Vibha be S,T,U,V respectively
initially in the beginning each persons share be
V = x U = y T = z
S = w = (x+y+z+32) Reason: She has to double others share, so she should have each and everyone’s share and still should be left out with 32
after 1st Round of game
S loses and is out with 32 and doubles the others share
V = 2x U = 2y T = 2z
After 2nd Round of game
T loses and is out with 32 and doubles the others share
V = 4x U = 4y
This means T had 2z = 2x + 2y + 32
After 3rd round of game
U looses and is out with 32 and doubles others share
V = 8x
This means U initially has 4y = 4x + 32
In the end V = 8x = 32
Solving this we get x = 4, y = 12, z = 32 and w = 80
There fore Suvarna had highest share in the beginning
In 3 hours thinker candle becomes half
In the same time thinner candle becomes one fourth. Now the
required condition is satisfied. So 3 Hours
8400
Answer: 450
Explanation:
10 * 150 = 1500
3 * 100 + 5 * 150 = 1050
1500 – 1050 = 450
ans is C.
let H be present age of husaband.W be present age of wife.
H+W=91.
now let diff between their ages be x.that is H-W=x.
now when husband is W yaers old, his wife must be W-x years
old.and it is given that H=2(W-x). so 2W-H=2x. and H-
W=x.eliminating x we get 4W=3H. but H+W=91, so solving thse
two H=52 W=39.
Employee Performance Standards. Employee performance measurements can determine an employee’s compensation, employment status or opportunities for advancement.
let MP = 100x
25% discount = 75x -> SP
Profit% = (Profit/CP)x100
125 = (75x/CP)x100
.: CP = 60x
Now if discount = 10%
SP = 90x
.: Profit% = ((90x-60x)/60x)x100 = 50%
Hard work would mean spending long hours to complete my work without any shortcuts. It definitely ensures results but the process is long and stressful. Smart work would be aiming for the same results but with planning and prioritization of tasks.
3, 5, 7, 12, 17, 19
D.12
GIVEN
80 CARDS IN 30 MINUTES.
Have to prove 7:30 ?
14 * 80 +80.
Answer is =1200.
( A ) 124
option 5