- University of debrecen, hungary General Aptitude Interview Questions
- University of debrecen, hungary Trainee Interview Questions
- University of debrecen, hungary Personal Questions round Interview Questions
- University of debrecen, hungary HR Interview Questions
- University of debrecen, hungary Lead Interview Questions
area is doubled.
actual area = 1/2 bh
after increase area = 1/2 *4b* h /2
=bh
1/2 *bh *2 = bh
therefore area is doubled
group wise work is use full and effectively
D
5/55*100=9.09% defective eggs
on the earth
9
X= pigeon
Y= hares
X+Y= 200
2x+4y=580
By solving y= 90
X=110
So Hares= 90
Given:
In a group of 15 students,
7 have studied Latin,
8 have studied Greek,
3 have not studied either.
To find:
The number of students who studied both Latin and Greek.
Solution:
In a group of 15 students, have studied Latin, 8 have studied Greek, 3 have not studied either.
Therefore,
n(A∪B) = 15 – 3
n(A∪B) = 12
7 have studied Latin,
n(A) = 7
8 have studied Greek,
n(B) = 8
n(A∩B) is the number of students who studied both Latin and Greek.
n(A∩B) = n(A) + n(B) – n(A∪B)
n(A∩B) = 7 + 8 – 12
n(A∩B) = 15 – 12
n(A∩B) = 3
The number of students who studied both Latin and Greek is 3
Final answer:
3 of them studied both Latin and Greek.
Thus, the correct answer .3
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
let x=speed
t=time taken when speed is x so…
xt=4/5x(t+40)
t=160 minutes
2 hr 40 minutes
21
119
I think the answer is: 16
the woman faster *1.5 from the man, every day.
because that, the exersize is:
24/1+1.5+x=6
x=1.5
24/1.5=16!