sow
It is assumed to be constant. Now, to cross past the pole, the train should cover a distance of x meters. Now, the time taken by the train to cross a platform of length 100 m is 25 seconds. Hence, the length of the train is 150 m.
Answer:
11 days.
Step-by-step explanation:
In the question,
Time taken by Ramesh to finish a piece of work = 20 days
Time taken by Sushil to finish a work = 25 days
Time for which they worked together = 5 days
Sushil left after = 5 days
So,
One day work of Ramesh is,
One day work of Sushil is,
So,
Work done in 5 days is given by,
Therefore, Remaining work is given by,
Now, as the Sushil left the remaining work was done by Ramesh,
Time taken by Ramesh for the remaining work is,
Therefore, the remaining work will be completed in 11 days by Ramesh.
If there are n bikes then the no. of people are 2n+1. n are dropped in firs trip, in second trip 3 bikes are unused, so 2n-3 + n covers 2n+1 people. i.e. n + 2n – 3 = 2n +1
n = 4
No. of people = 9
% error= (new no-actual no)/actual no *100
% error= [(x/7)-7x]/7x * 100
% error= 48x/49x * 100
% error= 0.9795*100=97.95
835, 734, 642, 751, 853, 981, 532
835,sum(digits)= 16
734 = 14
642=12
751= 13,
853=16,
981=18,
532=10
answer(c)751
890.488
Total marbles are 15
Blue and yellow are 5
Probability is 5/15
Ramu’s Mother-in-law means Ramu’s wife’s mother
Only daughter means Ramu’s wife
And daughter’s son means Ramu’s Son
Answer : Son
10000
one-legged =5% of 10000=500
remaining=10000-500=9500
barefooted=9500/2=4750
remaining people= 9500-4750=4750
hence required number of shoes= 4750*2+500*1=100005% of 10000 = 500 one legged
9500 / 2 = 4750 bare foot
minium no of shoes = 4750*2 + 500*1 = 10000
length is 30 breadth is 12 and height is 12
——————————
1
.——————————
1 .
1 .
1 10 .
1
1 .
1
1
1 30 .
——————————-.
1
consider right angled triangle
so the distance= square root of (30*30+10*10)
30 Sec
I agree with @TUMWINE PETER
temp at 3.oo pm is = 22.5
temp at 6.oo pm is = 30
thus, percentage rise= 7.5/30 *100
=25%