slower train – 48 kmph = 40/3 m/s
say faster train, v m/s
therefore, {v-(40/3)}*180 = 600, => v= 60 kmph
answer = 16.5Rs
A=3*9=27Rs
B=7*15=105Rs
132 R for 10 kg
therefore,
1kg amount = 132/10=13.2 so,
5kg mixture price = 13.2*5=66Rs
mixture will sell 25%profit then the price =66*(25/10)=33/2=16.5Rs
only if the results are greater than my input
4:3
A—–>B (first train)
B——>A(second train)
A/B=Srureroot((time to B)/(time to A))
D. Vice President
Maximum number of edges = 9. Start from one corner. Select any face including that corner. Complete a square (4 edges) around the face to reach at the starting corner point . Now, move to the opposite face through the edge joining them and passing through the starting point(1 edge). Now, complete the square of edges around this face(4 edges). Total = 4+1+4 = 9 edges
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
if initially the price was Re 1.the new price nw bcoms to b
0.7..
so ,if the price z 0.7 ,the increment required is 0.3
so % in crement= 0.3/0.7*100=42.87…
1:2
10 x 27=270
I will first need to understand why he/she behaves so to establish the exact cause and try persuade him to appreciate roles and responsibilities of the various Team members in trying to achieve organizational goals.
d / (x+1/2) = 4/5 * t
and d / (x-1/2) = 5/2 + t
solving we get d = 15.
270/(27*1000)*3600=36
$560
Mm