Metricon Homes is a leading residential construction company in Australia, renowned for its commitment to quality, innovation, and customer satisfaction. Established in 1976 by Mario Biasin, Metricon has grown into one of the country's largest home builders, with a reputation for delivering stylish and functional homes tailored to meet the diverse needs of homeowners.
With a focus on modern design and sustainable building practices, Metricon offers a wide range of home designs to suit various lifestyles and budgets. From contemporary urban residences to spacious family homes and luxurious custom builds, their portfolio showcases versatility and craftsmanship.
I’m the capable of what u expect from me and you should say what is the tallent u have which is used for that company…🥰
Let’s assume the length of each train is ‘L’ and the speeds of the two trains are ‘V₁’ and ‘V₂’ respectively.
When the trains are moving in the opposite direction, their relative speed is the sum of their individual speeds. The total distance they need to cover is the sum of their lengths. Since they cross each other completely in 5 seconds, we can set up the following equation:
(V₁ + V₂) × 5 = 2L
When the trains are moving in the same direction, their relative speed is the difference between their individual speeds. The total distance they need to cover is the difference between their lengths. Since they cross each other completely in 15 seconds, we can set up the following equation:
(V₁ – V₂) × 15 = 2L
Now, let’s solve these equations to find the ratio of their speeds.
From the first equation, we have:
(V₁ + V₂) × 5 = 2L
V₁ + V₂ = (2L) / 5
From the second equation, we have:
(V₁ – V₂) × 15 = 2L
V₁ – V₂ = (2L) / 15
Let’s add these two equations together:
V₁ + V₂ + V₁ – V₂ = (2L) / 5 + (2L) / 15
2V₁ = (6L + 2L) / 15
2V₁ = (8L) / 15
V₁ = (4L) / 15
So, the speed of the first train is (4L) / 15.
Now, let’s substitute this value back into the first equation to find V₂:
(4L) / 15 + V₂ = (2L) / 5
V₂ = (2L) / 5 – (4L) / 15
V₂ = (6L – 4L) / 15
V₂ = (2L) / 15
Therefore, the speed of the second train is (2L) / 15.
The ratio of their speeds is given by:
(V₁ / V₂) = ((4L) / 15) / ((2L) / 15)
(V₁ / V₂) = 4L / 2L
(V₁ / V₂) = 2
So, the ratio of their speeds is 2:1.
Let\: the\: total\: price \: be\: Rs. X\: then,
B= 2x/7 & A= \left ( x-2 \right )/7
So, A:B = 5x/7 : 2x/7 = 5 : 2
Let \: B’s \: capital\; be\: Rs.Y\: then\: \left ( 16000\ast 8 \right )/4y= 5/2
=> (16000\ast 8\ast 2)/(4\ast 5) = y
=> y = Rs. 12800
8
5
1900
maternal grand mother
Three man’s on day work = 1/6+1/7+1/8=73/168
three man’s can complete the work in 1/73/168 days
= 168/73 days
Now if they works together fro the alternet days they will
complete the worksin 2*168/73 days
(If three mans working for the alternate days then work
completion time will be doubbled)
105/29 mins
q
7 months
16
1+1=2
2+2=4
3+4-7
4+7=11
5+11=16
let x be sum.
SI of 18% for 1 year= x*18/100=0.18x;
SI of 18% for 2 years is 0.36x;
SI of 12% for 1 year= x*12/100=0.12x;
SI of 12% for 2 years is 0.24x;
Given, 0.36x-0.24x=840
0.12x=840
x=840/0.12=7000.