3*2-1=5
5*2-2=8
8*2-3=13
13*2-4=22
22*2-5=39
39*2-6=72
so series is 3,5,8,13,22,39,72
24 should be replaced by 22
24 is wrong…….
if it is for MIcrosoft Interview Question, I sure they will
give you the job if you answer, “Google it”.
0237
In 3500 g rod contains 74% of silver = 3500 * 74/100 = 2590 g
Then 3500 g + 500 g of rod contains 84% of silver
Let x be the silver contained in 500 g of silver
(2590/3500 * 100) + (x/500 * 100) = 84
74 + x/5 = 84
(370 + x) /5 = 84
370 + x = 420
x = 50
Then the percentage of silver contained in 500 g of rod = 50/500 *100 =10%
Alcohol content from
2 l of A (62.5%) : 1.35L
4L of B (87.5%) : 3.50L
Total Acohol content in 6 L : 4.85L or 80.8%
Reduction of 40% or 4/10th in price of bananas will lead to an increase of 4/(10 – 4) = 2/3rd part in quantity if expenditure is constant.
If original quantity is q, then :
2q/3 = 64
=> q = 64 x 3/2 = 96 = 8 dozens.
=> Original price per dozen = 40/8 = Rs 5
Since the car has met the person 20 minutes beforehand, it has saved 10 mins of a journey
A man has started 1.30 hrs before and the car has met him 10 mins before the actual time, he takes to reach daily is 1hr and 20 mins
CPNCBZ
Answer:
11 days.
Step-by-step explanation:
In the question,
Time taken by Ramesh to finish a piece of work = 20 days
Time taken by Sushil to finish a work = 25 days
Time for which they worked together = 5 days
Sushil left after = 5 days
So,
One day work of Ramesh is,
One day work of Sushil is,
So,
Work done in 5 days is given by,
Therefore, Remaining work is given by,
Now, as the Sushil left the remaining work was done by Ramesh,
Time taken by Ramesh for the remaining work is,
Therefore, the remaining work will be completed in 11 days by Ramesh.
30mins
Let the total time taken to fill the tank be x minutes.
Then, work done by B in half hour + work done by (A+B) in half hour =1.
(
40
1
×
2
x
)+(
60
1
+
40
1
)×
2
x
=1
⇒
80
x
+
48
x
=1
⇒
240
3x+5x
=1
⇒8x=240
⇒x=30 min
36, 64, 81, 125, 169
125
X+x+2+x+3=42
3x+6=42
3x=42-6=36
X=12
X+2=14
X+3=15
Middle number 14
Monday