72 kmph
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
s=36kmph
in meter per second is=36*5/18=>10
Let three consecutive even numbers be 2n,2n+2,2n+4
product=2n(2n+2)(2n+4)
If n=1,
product =2(4)(6)=48.
So, all the numbers will be divisible by 48 if change n.
C. Monday
A year has 52 weeks and every week has 7 days.
We just add up one day to the present day of the year and that would automatically act as the day of the next year.
In case of leap years in between, one extra day gets added in the entire year making it 366 days instead of 365 days in an ordinary year and we add two days in that case.
( a ) Treatment
3*12=36
consider the tank capacity as 90 litres.
to fill the tank in 3 hrs first pipe must flow at a rate of 30 litres/hr
2nd pipe has to flow at a rate of 45 litres/hr
if two pipes are opened at a time the flow rate will become 75 litres/hr
90/75= 6/5 = 1.2= (i.e) 1hr and 12 minutes 1 1/5 hr
Article price=200
After 25%increase =250
After 25% decrease =187.5
39 hrs 15 mins..
note:
he will not be having .45 mins for his lunch on saturday..