Statements :
Some kings are queens. All queens are beautiful.
Conclusions :
I. All kings are beautiful.
II. All queens are kings.
105/29 mins
1. 1g
2. 3g with 1g counter
3. 3g
4. 3g plus 1g
5. 3g plus 1 g plus 1g weighed medicine
6. 9g with 3g counter
7. 9g with 1g of counter and 1g weighed medicine
8. 9g with 1g counter
9. 9g
10. 9g plus 1g
11. 9g plus 3g with 1g on counter
12. 9g plus 3g
13. All 3 weights on one side.
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
Servlets are the Java programs that run on the Java-enabled web server or application server. They are used to handle the request obtained from the webserver, process the request, produce the response, then send the response back to the webserver.
Answer:270
Explanation: Formula is SI= P*R*T/100
Where P is principal amount
R is Rate
T is Time
So, SI= 500*6*9/100
i.e SI= 27000/100
SI= 270
20000
If Vijay gives ‘x’ marbles to Ajay then Vijay and Ajay would have V – x and A + x marbles.
V – x = A + x — (1)
If Ajay gives 2x marbles to Vijay then Ajay and Vijay would have A – 2x and V + 2x marbles.
V + 2x – (A – 2x) = 30 => V – A + 4x = 30 — (2)
From (1) we have V – A = 2x
Substituting V – A = 2x in (2)
6x = 30 => x = 5.
3 groups
B
Conclusion 1 follows