Seamless Distribution Systems Interview Questions, Process, and Tips

Ques:- The average temperature was 37C for Monday to Wednesday and 34C for Tuesday to Thursday . If the temperature on Thursday was 4/5 th of that of Monday,what was the temperature on Thursday?
Recent Answer : Added by Jade On 2022-09-22 16:41:17:

First write equations from info:
(A) (Mon + Tue + Wed)/3 = 111 Rearrange as ——–> Tue + Wed = 111 – Mon
(B) (Tue + Wed + Thu)/3 =102 Rearrange as ——–> Tue + Wed = 102 – Thu
(C) Thu = 0.8(Mon)

Substitute equation C into B:
(B) Tue + Wed = 102 – 0.8(Mon)

At this point I changed the values for clearer algebra:
Mon = x
Tue + Wed = y

Re-write equations A & B with new values:
(A) y = 111 – x
(B) y = 102 – 0.8x

Solve simultaneous equations:

111 – x = 102 – 0.8x
111 – 102 = x – 0.8x (Re-arraged)
9 = 0.2x
x = 45

Thus, Mon = 45C

Thu = 0.8(45)
Thu = 36C

So the answer is it was 36C on Thursday

Ques:- ” A,B,C,D,E and F are a group of friends. There are two house wives, one professor , one engineer, one accountant and one lawyer in the group.There are only two married couples in the group. The lawyer is married to D, who is a housewife. No women in the group is either an engineer or an accountant. C, the accountant, is married to F, who is a professor. A is married to housewife. E is not a housewife. What is E’s profession? “
Recent Answer : Added by PY On 2022-05-17 09:07:20:

Lawyer

Ques:- How does this job fit in with your overall career goals?
Ques:- X, Y and Z can do a piece of work in 24, 30 and 40 days respectively. They start the work together but Z leaves 4 days before the completion of the work. In how many days is the work done?
Recent Answer : Added by Admin On 2022-09-29 17:23:19:

One day’s work of A, B and C = (1/24 + 1/30 + 1/40) = 1/10.

C leaves 4 days before completion of the work, which means only A and B work during the last 4 days.

Work done by A and B together in the last 4 days = 4 (1/24 + 1/30) = 3/10.

Remaining Work = 7/10, which was done by A,B and C in the initial number of days.

Number of days required for this initial work = 7 days.

Thus, the total numbers of days required = 4 + 7 = 11 days.

Ques:- Tell me about your last movie that you see?
Ques:- A company figured it needed 37.8 sq.feet of carpot for its reception room. To allow for waste, it decided to order 20% more material than needed. Fractional parts of sq.feet cannot be ordered. At Rs.9/- a sq.feet, how much would the carpet cost?
Recent Answer : Added by Admin On 2020-05-17 12:00:22:

414 Rs
1.2*37.8=45.36=46 sq.feet
46*9=414 RS

Ques:- There are 7 letters A,B,C,D,E,F,GAll are assigned some numbers from 1,2 to 7.B is in the middle if arranged as per the numbers.A is greater than G same as F is less than C.G comes earlier than E.Which is the fourth letter
Recent Answer : Added by DK On 2022-03-09 16:28:52:

CORRECT ANS : B

Ques:- A train 360 m long is running at a speed of 45 km/hr. In what time will it pass a bridge 140 m long?
Recent Answer : Added by George On 2021-06-10 07:10:11:

total distance to travel the end of the train = 360 + 140 = 500 m
speed of train 45000m/60min = 750m/min or 750m/60sec
(500m*60sec)/750m=40sec the time will take to pass

Ques:- The sum of the square of the three consecutive even natural numbers is 1460. Evaluate the numbers?
Recent Answer : Added by shraddha On 2022-05-17 09:06:40:

let square be x (squares are 4 sides)
i.e., X+X+X+X=4X
4X+3=1460
4X=1460-3
4X=1457
X=364.25

Ques:- If you get job in this company what you will do for this company?
Ques:- A 180 meter long train crosses a man standing on the platform in 6 sec. What is the speed of the train?
Recent Answer : Added by Roopesh On 2021-06-15 17:06:46:

Which means the train will travel 180 m in 6 seconds so
We need to convert this into minutes
6×10 = 60s= 1 minute.
180×10 = 1800 m train will travel 1.8 km in 1 minute.
1.8×60 = 108 kmph

Ques:- A boy has nine trousers and 12 shirts. In how many different ways can he select a trouser and a shirt?
Recent Answer : Added by Admin On 2022-09-27 18:20:20:

108

Ques:- 7589 ? ? = 3434
A. 3721
B. 4155
C. 3246
D. 11023
E. None of these
Recent Answer : Added by Indupriya On 2022-05-17 09:06:46:

4155

Ques:- How do you define failure?
Ques:- There is a frog who can make jumps of length 3,5,7. There are stones in a river at distances a1, a2 an. The other end of the stream is n distance away. Can the frog cross the stream. What if the frog can make jumps backwards ?
Ques:- Do you like taking risks?
Recent Answer : Added by Radeus On 2021-11-09 15:53:59:

only if the results are greater than my input

Ques:- How much time before you can join us?
Ques:- Complete the series. 1/2, 3/4, 5/8, 7/16, ?
Recent Answer : Added by Tarif On 2022-09-28 17:42:56:

9/32

Ques:- Explain A Complex Database To Your Eight-Year-Old Nephew
Ques:- Describe a difficult situation you have to handle?
Ques:- How can u say that you are the right candidate for us?
Ques:- A person is staying in the 25th floor of a 30 storied building. While going to the office, he uses the lift upto zeroth floor. But while returning back from office, the person is using the lift upto 18th floor and use the staircase to reach his home. Can you explain a probable reason?
Recent Answer : Added by SARAVANAN E On 2021-06-11 05:14:16:

Because he is very short for his height he can press upto 18th floor button only

Ques:- If he sells 40 mangoes, he will get the selling price of 4 mangoes extra, What is his percentage increase in profit ?
Recent Answer : Added by Admin On 2020-05-17 12:02:06:

I have seen a few say 25% as an answer to this. But looks
like their math isn’t good and is extremeley complex to
have an asnwer of 25% to this question. Consider – Rs.1.00/-
per mango; so 40 mangoes = Rs.40.00/-, implies Rs.4.00/-
extra at the end of the deal. So he’s left with Rs.44.00/-
after selling 40 mangoes implies a profit of Rs.4.00/- over
Rs.40.00 = 44/40 = 110% which means his profit is 10%.
Hope this helps…
Thanks.

Ques:- If you get a better job within 6 months from the date you joined in our company. Will you leave the present company?
Ques:- How do you feel about reporting to a younger person?
Ques:- The size of the bucket is N kb. The bucket fills at the rate of 0.1 kb per millisecond. A programmer sends a program to receiver. There it waits for 10 milliseconds / and response will be back to programmer in 20 millisecond. How many much time the program takes to get a response back to programmer, after it is sent? Plz explain..
Recent Answer : Added by 9074743593 On 2021-07-29 16:19:39:

30

Ques:- Why you choosed biocon?
Ques:- A man has a wolf, a goat, and a cabbage. He must cross a river with the two animals and the cabbage. There is a small rowing-boat, in which he can take only one thing with him at a time. If, however, the wolf and the goat are left alone, the wolf will eat the goat. If the goat and the cabbage are left alone, the goat will eat the cabbage. How can the man get across the river with the two animals and the cabbage?
Recent Answer : Added by Avaneesh Shukla On 2022-05-17 09:09:43:

take goat from one side and leave it another side and then come back another side and carry cabbage from one side leave it near goat and carry goat back to other side and then carry wolf leave it another side with cabbage come back to
goat side and carray goat to other side not all three are there on another side

Ques:- A garrison of 3300 men has provisions for 32 days, when given at a rate of 850 grams per head. At the end of 7 days a reinforcement arrives and it was found that now the provisions will last 8 days less, when given at the rate of 825 grams per head. How, many more men can it feed?
Ques:- What is the smallest number by which 2880 must be divided in order to make it into a perfect square ?(a) 3(b) 4(c) 5 (d) 6
Recent Answer : Added by Aanchal Thakur On 2022-03-09 16:41:11:

5

Contact with us regarding this list

Devendra Bhardwaj With a decade of experience as a Job Hiring Expert, I am a results-driven professional dedicated to elevating recruitment strategies. My expertise lies in navigating the dynamic landscape of talent acquisition, employing innovative approaches to attract, assess, and secure top-tier candidates. I excel in optimizing hiring processes, leveraging cutting-edge technologies, and fostering collaborative relationships with stakeholders. A keen understanding of industry trends allows me to stay ahead, ensuring a competitive edge in securing the best talent for your organization. I am passionate about connecting the right people with the right opportunities and thrive in creating impactful, streamlined recruitment solutions.

Scroll to top