Put switch 1 on and leave it on for 2 minutes, then switch it off.
Put switch 2 on and leave it on, then walk into the room.
If the light is on, the answer is switch 2.
If the light is off but the bulb is warm when you feel it, the answer is switch 1.
If the light is off and the bulb is cold when you feel it, the answer is switch 3.
N O O N
S O O N
+ M O O N
----------
J U N E
4 1 1 4
5 1 1 4
+ 0 1 1 4
———-
9 3 4 2
C. 20
Answer: z and u
Explanation:
Y is to the right of U and exactly in front of V. Therefore,
U Y
V
Z is behind W and W and X are at extreme ends. So, W has to be to the right of Y. The final arrangement is as follows.
U Y W
X V Z Therefore, Z and U are at extreme ends is true.
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
answer = 16.5Rs
A=3*9=27Rs
B=7*15=105Rs
132 R for 10 kg
therefore,
1kg amount = 132/10=13.2 so,
5kg mixture price = 13.2*5=66Rs
mixture will sell 25%profit then the price =66*(25/10)=33/2=16.5Rs
The answer is W. Since, the direction left to him, would be west.
31.6%
100-20%=80
80-10%=72
72-5%=68.4
100-68.4= 31.6%
q
6/11 or 54.54%
1(1/7)hr
Form IV is the register of receipt and issue of raw materials which. With the replacement of private records in lieu of statutory records, no separate Form V is required provided you maintain private accounts for receipt, issue and closing stock of raw materials.