- Northwestern memorial hospital General Aptitude Interview Questions
- Northwestern memorial hospital Trainee Interview Questions
- Northwestern memorial hospital Personal Questions round Interview Questions
- Northwestern memorial hospital HR Interview Questions
- Northwestern memorial hospital Lead Interview Questions
7/5 * 5/q = 7/10
35/5q = 7/10
q=10
It’s choice A because you take the last to letters and move them to the front then the previous two letters go after them and so on.
I belive it is 3:45 hrmins
I am not doing my money investment in conventional manner
speed = 72 Kmph
Speed= 72 * 1000 / (60*60) m/s
speed= 72 * 5 / 18
speed= 20 m/s
time = 30 s
distance = 600 m
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
3, 4, 9, 22.5, 67.5, 202.5, 810
A. 4
sorry this question is irrelevant.
B. 3 : 2
360
Ok
Ans =18
Explanation:
Assume that initial there were 3*X bullets.
So they got X bullets each after division.
All of them shot 4 bullets. So now they have (X – 4)
bullets each.
But it is given that,after they shot 4 bullets each, total
number of bullets remaining is equal to the bullets each
had after division i.e. X
Therefore, the equation is
3 * (X – 4) = X
3 * X – 12 = X
2 * X = 12
X = 6
Therefore the total bullets before division is = 3 * X = 18
33
120
Question is not completed
The letters A, B, C, D, E, F and G, not necessarily in that order, stand for seven consecutive integers from 1 to 10
D is 3 less than A
B is the middle term
F is as much less than B as C is greater than D
G is greater than F
1. The fifth integer is
(a) A
(b) C
(c) D
(d) E
(e) F
ans:a
2.A is as much greater than F as which integer is
less than G
(a) A
(b) B
(c) C
(d) D
(e) E
ans:a
3. If A = 7, the sum of E and G is
(a) 8
(b) 10
(c) 12
(d) 14
(e) 16
4. An integer T is as much greater than C as C is
greater than E. T
can be written as A + E. What is D?
(a) 2
(b) 3
(c) 4
(d) 5
(e) Cannot be determined
ans:a
C. 8 kg