- North santiam school district General Aptitude Interview Questions
- North santiam school district Trainee Interview Questions
- North santiam school district Personal Questions round Interview Questions
- North santiam school district HR Interview Questions
- North santiam school district Lead Interview Questions
it was a friday.
When none of the digits are repeated:
The hundred’s place can be filled by any of the digits: 2, 3, 5, 6, 7 or 8 except the one which has already been used at the thousand’s place, so it can be filled in 5 ways.
Similarly tens’ place can be filled in 4 ways: only those 4 numbers which have not been use either at hundred’s or thousand’s place.
Unit’s place can be filled in only 3 ways. So, total number of nos. Possible =4×5×4×3= 240
7:8
Creative mind and innovative ideas is what I can offer to you. Please have a look at my work portfolio. I do not copy anyone’s work, I do not try to imitate the work of other creators. Gaining my inspiration from everyday life
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
270
6.35
Solution # 15-18
Sitting solution be- D T M B H R
Ans 15 :Mr. D
ans 16 : 1 2 3
Ans 17 : 3
Ans 18 : Mr B Suffering from anemia.
(130+x)/30=(45×5/18)
245 meters
2:3:4