let the third no be x ,
then the first no is 3x ,
second no is 2*3x ie 6x
average is (3x+6x+x )/3 = 20
10x/3 = 20
x= 60/10 = 6
third no is 6 , second is 6x = 36, first no is 3x = 18
largest no is 36 i.e second no
A
Suppose that x glassses are supplied safely , therefore
(100-x) glases are damage. Then equation is :
3x – 3(100-x) = 270
on solving this equation value of x comes out to be 95.
Speed of Stream = 1/2 (Downstream Speed – Upstream Speed)
=1/2(40-14)
=1/2(26)
=13km/h
method 2:
for down stream case :speed=Boat speed + Stream speed
for up stream case :speed=Boat speed – Stream speed
therefore, Bs + Ss =40
Bs – Ss =14
(-) (-) (-)
———————
2Ss=26
Ss=26/2 = 13Km/h
Stream speed= 13Km/hr
as total 16 floors out of them 11 were rented to A and B company .So remaining floors are 5 and each floor is 12000s.ft
So remaining = 12000*5
=60000
x+8y=20, x=-3y
(-3y)+8y=20
5y=20
y=4
The answer for y is 4
In the example first we have to find the area of the field
we have given the following values ,
cost of fencing per meter = Rs 1.50
Diameter of circular field = 28
We have to find the area , a = ?
We know that,
Area = 2 π r
= 2 x 22/7 x 14
= 2 x 22 x 2
= 44 x 2
= 88 sq. m
So, area of circle is 88 sq.m
Now just multiply it with 1.50
cost of fencing = 88 x 1.50
= Rs. 132
So, the cost of fencing the circular field is Rs. 132
Ratio of diameters=1:2
Ratio of radius=1:2
Ratio of volumes=(4/3*3.14*r1^3)/(4/3*3.14*r2^3)
=r1^3/r2^3=1^3/2^3=1/8
In 3500 g rod contains 74% of silver = 3500 * 74/100 = 2590 g
Then 3500 g + 500 g of rod contains 84% of silver
Let x be the silver contained in 500 g of silver
(2590/3500 * 100) + (x/500 * 100) = 84
74 + x/5 = 84
(370 + x) /5 = 84
370 + x = 420
x = 50
Then the percentage of silver contained in 500 g of rod = 50/500 *100 =10%
Answer:
11 days.
Step-by-step explanation:
In the question,
Time taken by Ramesh to finish a piece of work = 20 days
Time taken by Sushil to finish a work = 25 days
Time for which they worked together = 5 days
Sushil left after = 5 days
So,
One day work of Ramesh is,
One day work of Sushil is,
So,
Work done in 5 days is given by,
Therefore, Remaining work is given by,
Now, as the Sushil left the remaining work was done by Ramesh,
Time taken by Ramesh for the remaining work is,
Therefore, the remaining work will be completed in 11 days by Ramesh.