Take 5 pills from jar 1, 4 pills from jar2,…. and 1 pill
from jar 5 and put altogether in the scale. the ideal
weight should be (1+2+3+4+5)x10= 150gms. for eg if the jar2
is contaminated then the weight will be 146 gms. so
depending on the amount of weight loss we can identify the
contaminated jar.
ans=13.33
solution: (710/12)*8 – 460
Question
Active listening,Effective communication,Confidence.
15 litre water contains 20% alcohal ie. 12 (water)+ 3
(alcohol).
after adding 5 liter water it becomes 12+5=17 (water)& 3
(alc.).
ie. 17:3 and answer will be 85:15. ie. 15%.
40
simple logic, Check Option Lets father present age = 40 so it full fill all condition like his son age become 10 and after five years it will become 15 and father age is 45 and it full fill second condition that fathers age is thrice as old as the son after 5 years
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
x- sum of first 4 values
y – 5th value
x/4 = 45
x=45*4=180
(x+y)/5 = 46
(180+y)/5=46
180+y=230
y=50
9 days
d
I think speed of printing per minute has nothing do to with how long printer being at work.
If “given day” = 8 hours.
8h = 480m
x = 176400 / 480 = 367.5 lines per minute.