cut a sphere in all 3 axis with center point as common point
of all axis.
u would be getting 2 lines and an arc
in other words
sphere is cut into 3 cuts in x,y,z directions
it is only similar
One day’s work of A, B and C = (1/24 + 1/30 + 1/40) = 1/10.
C leaves 4 days before completion of the work, which means only A and B work during the last 4 days.
Work done by A and B together in the last 4 days = 4 (1/24 + 1/30) = 3/10.
Remaining Work = 7/10, which was done by A,B and C in the initial number of days.
Number of days required for this initial work = 7 days.
Thus, the total numbers of days required = 4 + 7 = 11 days.
c
2, 6, 12, 72, 824
2
6*2=12
12*6=72
72*12=864
I’m the capable of what u expect from me and you should say what is the tallent u have which is used for that company…🥰
445, 221, 109, 46, 25, 11, 4
C.46
4+7
11+(7*2)
25+(7*2*2)
53+(7*2*2*2)
109+(7*2*2*2*2)…..
answer is one
E non of those
1, 2, 4, 8, 16, 32, 64, (…..), 256
128
17.9
A & B one day work= 1/18 + 1/30= 8/90
As we know that number of work is 1
1÷8/90= 1*90/8= 90/8.
Since they say “ twice the amount of work
Then ,2*90/8= 22.5 days
16
grand daughter
mausi
Can someone confirm that it is : 5/9 * 4/8 * 3/7 = 11.9% that you choose 3 good bulbs in a row
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
X share is 10500
Y share is 13500
Z share is 16500
ans 810 i think