X filling rate is 1/18 or 4/72 per hour
Y filling rate is 1/24 or 3/72 per hour
Combined as a pair it’s 7/72 in a complete 2 hour alternating sequence
72+ 7/72 =10 sequences = 70/72 on 20 hours, The outstanding balance is just 2/72
So at 20.5 hours with X turn filling is 100% complete with 72/72
Answer: It will take 20.5 hours to completely fill this tank.
Analysis of measured filling process, from X = 42/72 share & from Y = 30/72 share
Let Suvarna, Tara, Uma and Vibha be S,T,U,V respectively
initially in the beginning each persons share be
V = x U = y T = z
S = w = (x+y+z+32) Reason: She has to double others share, so she should have each and everyone’s share and still should be left out with 32
after 1st Round of game
S loses and is out with 32 and doubles the others share
V = 2x U = 2y T = 2z
After 2nd Round of game
T loses and is out with 32 and doubles the others share
V = 4x U = 4y
This means T had 2z = 2x + 2y + 32
After 3rd round of game
U looses and is out with 32 and doubles others share
V = 8x
This means U initially has 4y = 4x + 32
In the end V = 8x = 32
Solving this we get x = 4, y = 12, z = 32 and w = 80
There fore Suvarna had highest share in the beginning
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
Answer is 8,12,5,20
8+2=10
12-2=10
5*2=10
20/10=10
( c ) 15 litres
28
to arrange m objects in n places => nCm
i.e. for this example m=2(+,- sign) and n = 8(places between two number from 1 to 9)
SO, answer is : 8C2 = (8*7) / 2 = 28
36
decrease two times
10%