To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
7,9,11
3 min
the answer is 45 km/h
Define x:
Let the total distance be x.
Find the time needed in terms of x for speed at 30 km/h:
Find the time needed in term of x for 40 km./h:
Find the difference in time:
Solve x:
Find the total time needed to for the whole journey:
Given that he was 40 mins late:
Find the minimum speed needed:
Answer: The minimum speed is 45 km/h
suppose
pipe:
A -30 hours A’s effeciency (60/30) =2
60( lcm of 30 and 20)
B- 20 hours B’s effeciency (60/20)=3
time taken by both to fill = 60/5 =12 as given in question (effeciencies of both a+b =2+3=5)
time taken by faster pipe i.e b = 60/3 =20
boys= x
girls=2x
boys+girls= 60
x+2x=60
x=60/3
x=20
kamal=17th rank
9 girls are ahead of kamal
17-9=8
20-8=12 boys are after kamal’s rank
Hard work would mean spending long hours to complete my work without any shortcuts. It definitely ensures results but the process is long and stressful. Smart work would be aiming for the same results but with planning and prioritization of tasks.
speed of the train respect to man
= (63 – 3) km/hr
= 60 km/hr
= 60 * 1000 / 3600 m/sec
= 50/3 m/sec
time
= distance/speed
= 500 * 3/ 50
= 30 sec
Let the journey distance be : x miles
Now x/40+x/30=8 (time=distance/speed)
Solving this for x we get. x=960/7
therefore, x=137(approx)