- Human resources professional General Aptitude Interview Questions
- Human resources professional Trainee Interview Questions
- Human resources professional Personal Questions round Interview Questions
- Human resources professional HR Interview Questions
- Human resources professional Lead Interview Questions
13. 253, 136, 352, 460, 324, 631, 244
324
the sum of all = 10
Accept
324 = 3+2+4 =/=10 (NOT EQUAL TO 10)
Lets call the 5 litre jug as jug A and 3 litre jug as jug B. Now, follow the steps:
Fill jug A completely. Now it contains 5 litres.
Slowly pour the water from jug A to jug B until jug B is completely filled. Now, jug A contains 2 litres and jug B contains 3 litres.
Throw away the water in jug B so that it is completely empty. Now, jug A contains 2 litres and jug B is empty.
Transfer the water from jug A to jug B. Now, jug A is empty and jug B contains 2 litres.
Fill jug A completely. Now, jug A contains 5 litres and jug B contains 2 litres.
Transfer water from jug A to jug B until jug B is completely filled. Now, jug A contains 4 litres and jug B contains 3 litres.
Now you have 4 litres of water in jug A.
$560
A
Let and A and B are playing and A has 3$ and B won 3 times.
Total money earn by A = no of games A won – no of games A loss
if A loss game means B won.
Therefore
Total money earn by A = no of games A won – no of games B won
3 = no of games A won -3
no of games A won=6
So
A won = 6 games
B won = 3 games
Hence total no of games is 9
17 secs
B. 3 : 2
835, 734, 642, 751, 853, 981, 532
835,sum(digits)= 16
734 = 14
642=12
751= 13,
853=16,
981=18,
532=10
answer(c)751
P Q R S
TP -> UQ -> RV -> SW
Answers-
U sits opposite to S
Q sits in between S and R (after interchange)
GIVEN: 2A(B+C)+AC-2C(A-B)
THEREFORE 2AB+2AC+AC-2AC+2BC
2AB+AC+2BC
2(AB+BC)+AC
LET b1=AB b2=BC b3=AC
STEP1: b1 = b1+b2
so b1 = AB+BC
THEREFORE
NOW: b1 = AB+BC b2 = BC b3 = AC
STEP 2: b3 = b1+b3
so b3 = AB+BC+AC
THEREFORE
NOW: b1 = AB+BC b2 = BC b3 = AB+BC+AC
STEP3:
NOW: b1 = b1+b3
so b1 = AB+BC+AB+BC+AC
=2(AB+BC)+ AC
AB BC AC
STEP1 AB+BC BC AC
STEP2 AC BC AB+BC+AC
STEP3 AB+BC+AB+BC+AC BC AB+BC+AC
i.e 2(AB+BC)+AC BC AB+BC+AC
A
original cost is 100^2 / (100^2 – p^2) Rs
Paternal Grandmother
option 5