CORRECT ANS : B
speed=mile/hour
.•. time taken to travel M miles is
So, time =distance/speed
=M/m/h
=Mh/m hrs
area is given by Area of Rectangle = Length of Rectangle*(sqrt((Diagonal of Rectangle^2)-(Length of Rectangle^2)))
so substituting we get area=4*(sqrt((25-16)))
area=4*(sqrt(9))
since area cannot be negative hence we take sqrt of 9 as 3 (as sqrt of 9 is 3 and -3 as well)
area=4*3=12m^2
8400
Friday
B. No such pair exists
4, 5, 15, 49, 201, 1011, 6073
Correct option is A)
2nd term =(1stterm×1+2)=(4×1+2)=6
3rd term =(2ndterm×2+3)=(6×2+3)=15
4th term =(3rdterm×3+4)=(15×3+4)=49
5th term =(4thterm×4+5)=(49×4+5)=201 and so on
∴5 is wrong.
divisible by 8 – 124
” 12 – 83
” both – 41
124 + 83 – 41 = 166
999 – 166 = 833
ans is 833…..
a
at least 2, at most 4….
2 if you get lucky the first 2 times you draw a jelly bean, 4 would be if in the first 3 tries you get one of each color and the next draw will get you 2 of the same color
Statements :
No man is a donkey. Rajesh is a man.
Conclusions :
I. Rajesh is not a donkey.
II. All men are not Rajesh.
E
3, 7, 15, 27, 63, 127, 255
B. 27
( Number × 2 ) + 1
3 × 2 + 1 = 7
7 × 2 + 1 = 15
15 × 2 + 1 = 31 ( not 27 )
31 × 2 + 1 = 63
63 × 2 + 1 = 127
127 × 2 + 1 = 255
10, 25, 45, 54, 60, 75, 80
54
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
8400 ? 120 x 15 + 150 = ?
ans:
8400 % 120 x 15 + 150 = ?
1200
Day 1: 30-3ft = 27+2ft = 29
Day 8: 23 jumps 3ft = 20 slips 2ft = 22
Day 16: 13 jumps 3ft = 10 slips 2ft = 12
Day 24: 3 jumps 3ft = Out?
Answer: 5400
Explanation:
100x + 400 = 12(x – 5)
x = 50
100 * 50 + 400 = 5400