Mr. Brown painted the first whole house in 6 days plus 1/3 of the second house in the next 2 days. Mr. Black can paint a whole house in 8 days and had 8 days to work, so he painted the equivalent of 1 whole house. That accounts for 2-1/3 houses painted. Mr. Blue only needs to paint 2/3 of the last house, so 2/3 times 12 days equals 8 days.
Let the money borrowed by Nitin=Rs.P
According to the question,
(P×6×3)/100+(P×9×5)/100+(P×13×3)/100=Rs.8160
ans=8000
let x be lenghth of candles.
thicker one—- in 1 hr 1/6th will go.
thinner one— in 1 hr 1/4th will go.
let he lit for n hrs.
so in n hrs thicker one goes n/6.
and thinner one goes n/4.
so remainini length are x-n/6 and x-n/4.so x-n/6=2(x-n/4)
implie n=3x. if x=1 n=3hrs.
Answer:
Since the car has met the person 20 minutes before hand, it has actually saved 10 mins of journey (to and fro)
since the man has started 1.30 hrs before and car has met him 10 mins before actual time he takes to reach daily is 1hr and 20 mins
35 km/h = 10 m/s
Speed = Distance/Time
Distance= (100+150)m = 250m
Speed = 10 m/s
Time= 250/10 = 25s
(x**2 – 6* x + 5) = (x-1)*(x-5)
(x**2 + 2 * x + 1) = (x + 1) * (x+1) = (x+1)**2
For what x is (x-1)*(x-5)/( (x+1)**2) a minimum?
One way to answer this question is by using calculus.
Take the derivative, and set to zero.
Since this is a fraction of polynomials, and a fraction is
zero only if it’s numerator is zero, we need calculate only
the numerator of the derivative and set it to zero.
The numerator of the
Derivative of (x-1)*(x-5)/( (x+1)**2) is
( (x-1) + (x-5) ) ( x+1)**2 – (x-1)(x-5)( 2 (x+1) )
= (2 x – 6) (x+1)**2 – (2) (x-1)(x-5) (x+1)
= 0
Divide through by 2 (x+1)
(x-3)(x+1) – (x-1)(x-5) = 0
(x**2 – 2 x – 3 ) – (x**2 – 6 x + 5) = 0
x**2 – x**2 – 2 x + 6 x – 3 – 5 = 0
4 x – 8 = 0
x = 2
Plugging in x = 2 into the original
(x**2-6*x+5)/(x**2+2*x+1)
gives us (2**2 – 6 * 2 + 5)/(2**2 + 2*2 + 1)
= (4 – 12 + 5) / (4 + 4 + 1) = -3/9 = -1/3
Least value is -1/3
C)3
Answer:
11 days.
Step-by-step explanation:
In the question,
Time taken by Ramesh to finish a piece of work = 20 days
Time taken by Sushil to finish a work = 25 days
Time for which they worked together = 5 days
Sushil left after = 5 days
So,
One day work of Ramesh is,
One day work of Sushil is,
So,
Work done in 5 days is given by,
Therefore, Remaining work is given by,
Now, as the Sushil left the remaining work was done by Ramesh,
Time taken by Ramesh for the remaining work is,
Therefore, the remaining work will be completed in 11 days by Ramesh.
to find the root of f(x) = 0;