data inadequate
( A ) 124
1875
– While the train is moving, the jogger will also be running in the same direction.
– for the head(engine) of the train to get to the current position of the jogger 240m away, it will take:
45km/hr => 12.5m/s => 240/12.5 = 19.2 seconds.
– But in the same period of time, the jogger will still be running and will have moved to a new location by: 9km/hr => 2.5m/s => 2.5 * 19.2 = 48m
To get to the new location at the speed of 12.5m/s will take the train:
48/12.5 = 3.84sec
In this additional time, the jogger will move forward by:
3.84 * 2.5 = 9.6m
at a speed of 12.5m/s, it will take the train less than a second to cover the additional 9.6m
If we add the distance the jogger will cover in 1 second to 9.6, it is still less than what the train can cover per second. let us see (9.6 + 2.5 = 12.1)
Therefore, the head of the train will pass the runner at approximately: 19.2 + 3.84 + 1 => 24.04 seconds.
For the train to completely pass the runner, it will need its whole length of 120m to be in front of the runner.
This will take an additional (9.6 + 2) seconds.
Therefore for the length of the train to be ahead of the runner it will take approx. 35.65 (24.04 + 9.6 + 2) seconds
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
390
Ans : – 215
Explanation :-
1^3 = 1-1=0
2^3 = 8-1 = 7
3^3 = 27-1=26
4^3 = 64 – 1 = 63
5^3 = 125-1 = 124
Hence, Ans is
6^3 = 216-1=215
12
he removed one bolt in each three wheels
and fixed the bolts in stephiny wheel
Loved by our community
17 people found it helpful
author link
NabasishGogoi
Ace
686 answers
168.2K people helped
0L -> 1 way
1L -> 3 ways
2L -> 7 ways
3L -> 4 ways
4L -> 1 way
total 16 ways
I have seen a few say 25% as an answer to this. But looks
like their math isn’t good and is extremeley complex to
have an asnwer of 25% to this question. Consider – Rs.1.00/-
per mango; so 40 mangoes = Rs.40.00/-, implies Rs.4.00/-
extra at the end of the deal. So he’s left with Rs.44.00/-
after selling 40 mangoes implies a profit of Rs.4.00/- over
Rs.40.00 = 44/40 = 110% which means his profit is 10%.
Hope this helps…
Thanks.
ans: 40
6/3*12/3*15/3=40
X-340 = X x 4 x 8/ 100
100X – 34000 = 32X
68X = 34000
X = 34000/68
X= 500.