- Department of planning, transport and infrastructure (dpti) General Aptitude Interview Questions
- Department of planning, transport and infrastructure (dpti) Trainee Interview Questions
- Department of planning, transport and infrastructure (dpti) Personal Questions round Interview Questions
- Department of planning, transport and infrastructure (dpti) HR Interview Questions
- Department of planning, transport and infrastructure (dpti) Lead Interview Questions
120 (5×4!)
Before Swapping
_ _ _ _ _ _ _ Shilpa ……..Reena _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
After Swapping
_ _ _ _ _ _ _ Reena _ _ _ _ _ Shilpa _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
—————————–>14=17 <——————————-
So total number of girls in that row are 30
B
a
41, 43, 47, 53, 61, 71, 73, 81
81
1 1 2+4
2 2 1+4
3 1+2 4
4 4 1+2
5 4+1 2
6 4+2 1
7 4+2+1 0
Let cost for apple be a Cost for banana be b and Orange be c
So by first value expression becomes 17a + 13b + 9c =130 ———-1 therefore if you further solve a = (130 – 13b – 9c)/17 ———- 2 the second expression becomes: 13c + 7a + 10b = 100 ———- 3 If you put value of a in second expression it becomes: 13c + 7[(130 – 3b – 9c)/17] +10b = 100
Further if you solve you get value of b:
b = 10 – 2c ———-4
put value of b from 4 in 1
17a + 13 [10 – 2c] + 9c = 130
Further if you solve you find value of a
a = c ———-5
Put 5 in 3
13c + 7c + 10b = 100
further solve you get: c = 1 ———-6
from 5 and 6
a = c = 1 ———-7
Substitute value of c in expression 4
b = 10 – 2c b = 10 -2 * 1 b = 8 ———-8
therefore a + b + c = 10
130 years
77
under pressure a person more effort to his work
ans: .1432 inch
1-3/4=1/4
1-1/12=11/12
1/8,1/4,11/12 are broken off
so
5/8
5/8/4
5*11/8/4/12
remaining .1432inch
A perfect square is a square number of a digit. eg 64 is a perfect number, a square of 8
Now digits AB9 is a square number of a number.
AB9 Can also be written as A multiply by B multiply by 9
Get the Square root of AB9
Assumption, A=1, B=1
1*1=1=A, 1*1=1=B Therefore,
Square root of A = A, B = B and 9=3
Therefore
An odd number is a number indivisible by 2.
for example 1,3,5,7…….
Therefore Squares A*B*9= AB9
Where a=1, b=1, 3 as digits.
Conclusion
A=1 is an odd number
C will take 4 days and the total number of days taken by a,b and c will be 12 days.
Length of train = 125Mtrs
Speed of man = 5Km/Hr
=(5*1000)/(1*3600)
=1.4M/s
Time taken for train to pass = 10s
Spd = D/T
Total Distance (Man distance+ Train Length)
#Distance covered by Man in 10s
D=Spd*T
= (1.4M/s*10s)
= 14Mtrs
#Train length = 125Mtrs
Total D = 14Mtrs + 125Mtrs
= 139Mtrs
Time taken = 10s
Sp = D/t
=139M/10s
=13.9M/s