Ques:- How many days stay at Mundra?
Ques:- Why do you want to get this job?
Ques:- A car after covering ½ of a journey of 100 km develops engine trouble and later travels at ½ of its original speed. As a result, it arrives 2 hours late than its normal time. What is the normal speed of the car is?
Ques:- A person needs 6 steps to cover a distance of one slab. If he increases his foot length (step length) by 3 inches, he needs only 5 steps to cover the slabs length. What is the length of the each slab
Ques:- How you can be fit for this position ?
Ques:- Two numbers 4242 and 2903 when divided by a certain number of three digits, leave the same remainder. Find the number?
Ques:- A dishonest dealer professes to sell goods at the cost price but uses a false weight and gains 25%. Find his false weight age?
Ques:- Do your SWOT analysis
Ques:- There are 6 red shoes & 4 green shoes . If two of red shoes are drawn what is the probability of getting red shoes
Recent Answer :
: 5/9
Ques:- A train speeds past a pole in 15 seconds and a platform 100 m long in 25 seconds. What is the length of the train?
Recent Answer :
: 150m
Ques:- Every day a cyclist meets a train at a particular crossing .The road is straight before the crossing and both are travelling in the same direction.Cyclist travels with a speed of 10 kmph.One day the cyclist come late by 25 minutes and meets the train 5 km before the crossing.What is the speed of the train?
Ques:- My aim in became to MBA (HR) graduate
Ques:- What did you quit your earlier assignments ?
Ques:- About personal
Ques:- Two trains are on same track and they are coming toward each other. The speed of first train is 50 KMs/h and the speed of second train is 70 KMs/h. A bee starts flying between the trains when the distance between two trains is 100 KMs. The bee first flies from first train to second train. Once it reaches the second train, it flies back to the second train ? and so on until trains collide. Calculate the total distance traveled by the bee. Speed of bee is 40 KMs/h. .
Recent Answer :
: Answer: 66.67 km approx.
Solution:
Let the first train A move at u km/h.
Let the second train B move at v km/h.
Let the distance between two trains be d km
Let the speed of bee be b km/h
Therefore, the time taken by trains to collide = d/(u+v)
Now putting all the known values into the above equation, we get,
u = 50 km/hr
v = 70 km/hr
d = 100 km
b = 80 km/hr
Therfore, the total distance travelled by bee
= b*d/(u+v)
= 80 * 100/(50+70)
= 66.67 km (approx)
Ques:- Why do you left your job?
Ques:- Two trains each 250 m in length are running on the same parallel lines in opposite directions with the speed of 80 kmph and 70 kmph respectively. In what time will they cross each other completely?
Recent Answer :
: 12 sec
Ques:- The positions of the first and the fifth digit in the number 93264187 are interchanged. Similarly, the positions of the second and the sixth digits are inter changed and so on. Which of the following will be the third digit from the right end after the rearrangement?
A. 8
B. 3
C. 2
D. 6
E. None of these
Recent Answer :
: The Answer is 3
Ques:- Find the greatest number which will divide 25, 73 and 97 so as to leave the same remainder in each case.
A. 12
B. 18
C. 24
D. 32
Recent Answer :
: required number =H.C.F of (73-25),(97-73) & (97-25)
=H.C.F of 48 , 24 and 72 = 4 (c)
Ques:- U r relevent or not?
Ques:- 12.05 x 5.4 ? 0.6 = ?
Recent Answer :
: =12.05×5.4/0.6
=12.05×9.0
=108.45
Ques:- Are you applying for other jobs also?
Ques:- Which of the following Indian company has been listed at the top in Global-500 list ?
Ques:- 20% of a 6 litre solution and 60% of 4 litre solution are mixed. What percentage of the mixture of solution
Ques:- What do you mean by GSM, CDMA?
Ques:- What are some of the things on your job you feel you have done particularly well or in which you have achieved the greatest success? Why do you feel this way?
Ques:- 1/8 is devided by ‘s’ , if ‘s’ is incresed by 2 times, what is the result.
Recent Answer :
: 1/24S
Ques:- P and Q started a business investing Rs.85,000 and Rs.15,000 respectively. In what ratio the profit earned after 2 years be divided between P and Q respectively?
A. 3 : 4
B. 3 : 5
C. 15 : 23
D. 17 : 3
Recent Answer :
: D. 17 : 3
Ques:- Explain an occasion where you had to make a decision on your own? Were you happy with your decision making process?
Ques:- A building with height D shadow up-to G. A neighbor building with what height shadows C feet.
90 inches
Slab = 6(x) where x is each step
Slab = 5(x + 3)
6(x) = 5(x + 3)
6(x) = 5(x) + 15
x = 15 inches
So 6(x) = 6(15) = 90
Check: 5( x + 3) = 5(18) = 90
Slab size is 90 inches