B
Form IV is the register of receipt and issue of raw materials which. With the replacement of private records in lieu of statutory records, no separate Form V is required provided you maintain private accounts for receipt, issue and closing stock of raw materials.
X+x+2+x+3=42
3x+6=42
3x=42-6=36
X=12
X+2=14
X+3=15
Middle number 14
Statements :
Some books are pens. No pen is pencil.
Conclusions :
I. Some books are pencils.
II. No book is pencil.
E
Mixture is 1.2 L of A + 2.4L of B which is 3.6L total. 1.2L / 3.6L = 1/3 (0.33)
West
Let’s assume the length of each train is ‘L’ and the speeds of the two trains are ‘V₁’ and ‘V₂’ respectively.
When the trains are moving in the opposite direction, their relative speed is the sum of their individual speeds. The total distance they need to cover is the sum of their lengths. Since they cross each other completely in 5 seconds, we can set up the following equation:
(V₁ + V₂) × 5 = 2L
When the trains are moving in the same direction, their relative speed is the difference between their individual speeds. The total distance they need to cover is the difference between their lengths. Since they cross each other completely in 15 seconds, we can set up the following equation:
(V₁ – V₂) × 15 = 2L
Now, let’s solve these equations to find the ratio of their speeds.
From the first equation, we have:
(V₁ + V₂) × 5 = 2L
V₁ + V₂ = (2L) / 5
From the second equation, we have:
(V₁ – V₂) × 15 = 2L
V₁ – V₂ = (2L) / 15
Let’s add these two equations together:
V₁ + V₂ + V₁ – V₂ = (2L) / 5 + (2L) / 15
2V₁ = (6L + 2L) / 15
2V₁ = (8L) / 15
V₁ = (4L) / 15
So, the speed of the first train is (4L) / 15.
Now, let’s substitute this value back into the first equation to find V₂:
(4L) / 15 + V₂ = (2L) / 5
V₂ = (2L) / 5 – (4L) / 15
V₂ = (6L – 4L) / 15
V₂ = (2L) / 15
Therefore, the speed of the second train is (2L) / 15.
The ratio of their speeds is given by:
(V₁ / V₂) = ((4L) / 15) / ((2L) / 15)
(V₁ / V₂) = 4L / 2L
(V₁ / V₂) = 2
So, the ratio of their speeds is 2:1.
Reliable Assistance: I promise to provide reliable and accurate assistance in answering questions, providing information, and engaging in meaningful conversations. I strive to deliver helpful and relevant responses to the best of my abilities, drawing from the vast knowledge and information I have been trained on.
Continuous Improvement: I promise to continuously improve my capabilities and expand my knowledge base. As technology evolves and new information becomes available, I aim to stay up-to-date and provide the most accurate and relevant information possible. I strive to enhance my understanding of different topics and improve the quality of my responses over time.
Respectful and Ethical Interaction: I promise to interact with users in a respectful and ethical manner. I am programmed to respect user privacy, confidentiality, and cultural sensitivities, aiming to provide a positive and helpful experience for those who engage with me.
Please note that while I can provide valuable assistance and information, there are certain tasks that may be better suited for human professionals with expertise in specific fields.
20/- per day
So, if he work one day
So,1*20=20
1/3*20=20/3
2/3*20=40/3
1/8*20=5/2
3/4*20=15
so,
20+20/3+40/3+5/2+15=57.5
So ans is 57.5 is the ans
Business Process Outsourcing, or BPO, refers to the process of contracting standard business functions to be handled by a party outside of the company.
BPO is the abbreviation for business process outsourcing, which refers to when companies outsource business processes to a third-party (external) company.
4%
43.69
Because the total distance will be =100+80000m=80100m. Thus two train coming towards, so the speed will be increase. speed will be =60+50=110km/h, The time of crossing will be 43.69 minutes.
6, 12, 48, 100, 384, 768, 3072
B. 100
Niece
C
suppose
pipe:
A -30 hours A’s effeciency (60/30) =2
60( lcm of 30 and 20)
B- 20 hours B’s effeciency (60/20)=3
time taken by both to fill = 60/5 =12 as given in question (effeciencies of both a+b =2+3=5)
time taken by faster pipe i.e b = 60/3 =20